mmrc icon

Civil

Sr. No. Title Type Tender Ref No Date Of Issue Download
1 Maintenance Contract for Rehabilitation & Resettlement (R&R) sites and allied works under Mumbai Metro Line-III of MMRCL Notice MMRC/Planning/RandR/CivilMC/NIT/18/06 06/11/2018 file
2 Design, Fabrication, Supply and Erection of Pre-Engineered Steel Buildings for Stabling Yards at Aarey Depot of Mumbai Metro Line-3 (Colaba-Bandra-SEEPZ) Project Notice - 2nd call MMRC/ML-3/Car Depot/PEB/2018 02/11/2018 file
3 Invitation for Bids for “Part Design, Procurement and Supply, Installation, Testing and Commissioning of ballastless Track on the Mainline from BKC station (excluded) to Cuffe Parade station (included) excluding the procurement and supply of Head Hardened rail 60 E1 (UIC 60), 1080 grade HH, Turnouts, Scissor Crossovers and Buffer Stops for Mumbai Metro Line 3 (Colaba – Bandra – SEEPZ) Notice 10B MM3-CBS-TWK-02 28/09/2018 file
4 Invitation for Bids for “Part Design, Procurement and Supply, Installation, Testing and Commissioning of ballastless Track on theMainline from Aarey station (excluded) until BKC station (included) and ballasted Track in the area of at-grade Aarey Station and in the Depot area, excluding the procurement and supply of the rail Fastener System for Mainline of Mumbai Metro Line 3 (Colaba – Bandra – SEEPZ) Notice 10A MM3-CBS-TWK-02 28/09/2018 file
5 Design, Fabrication, Supply and Erection of Pre-Engineered Steel Buildings for Stabling Yards at Aarey Depot of Mumbai Metro Line-3 (Colaba-Bandra-SEEPZ) Project Addendum No 1 MMRC/ML-3/Car Depot/PEB/2018 14/09/2018 file
6 Civil Maintenance Contract for MMRCL’s New Office Building situated in E Block, Bandra Kurla Complex, Bandra (E), Mumbai Notice MMRC/Planning/New Office/CivilMC/NIT/18/03/2nd Call 11/09/2018 file
7 Civil Maintenance Contract for Rehabilitation & Resettlement (R&R) sites under Mumbai Metro Line-III of MMRCL Notice MMRC/Planning/R&R/CivilMC/NIT/18/05/2nd Call 04/09/2018 file
8 Design, Fabrication, Supply and Erection of Pre-Engineered Steel Buildings for Stabling Yards at Aarey Depot of Mumbai Metro Line-3 (Colaba-Bandra-SEEPZ) Project Notice MMRC/ML-3/Car Depot/PEB/NIT/2018 21/08/2018 file
9 Construction of permanent staff quarters & stable of Aarey department affected in Mumbai Metro Line-3 project Notice MMRC/ML-3/Ramp/Unit-19/Cont/NIT/2018 27/07/2018 file
10 Architectural consultancy for construction of permanent staff quarters & stable of Aarey department affected in Mumbai Metro Line-3 project Notice MMRC/ML-3/Ramp/Unit-19/Arch/RFP/2018 27/07/2018 file

Stay Informed

2 + 3 =
Top