mmrc icon

Civil

Sr. No. Title Type Tender Ref No Date Of Issue Download
1 Architectural, Structural Design and Project Management Consultancy Services for the redevelopment of project affected buildings at Kalbadevi & Girgaon stations on Mumbai Metro Line 3. Addendum No 1 MMRC/Planning/PIU/KG3 21/06/2017 file
2 Invitation for Pre-qualification of Applicants for Procurement of Part Design, Supply, Installation Testing and Commissioning of Ballastless track for underground section from Aarey to Cuffe Parade, Ballasted Track in the area of at-grade Aarey station and in the Depot for the Mumbai Metro Line 3.: Package-10A & 10B Addendum No 1 MM3-CBS-TWK 21/06/2017 file
3 Notice for Architectural, Structural Design and Project Management Consultancy Services for the redevelopment of project affected buildings at Kalbadevi & Girgaon stations on Mumbai Metro Line 3. Notice MMRC/Planning/PIU/KG3 07/06/2017 file
4 RFP for Architectural, Structural Design and Project Management Consultancy Services for the redevelopment of project affected buildings at Kalbadevi & Girgaon stations on Mumbai Metro Line 3. RFP MMRC/Planning/PIU/KG3 07/06/2017 file
5 Invitation for Prequalification of bidders for Procurement of Part Design, Supply, Installation, Testing and Commissioning of Ballastless track for underground section from Aarey to Cuffe Parade, Ballasted Track in the area of at-grade Aarey station and in the Depot for the Mumbai Metro Line 3. PQ Document MM3-CBS-TWK 11/05/2017 file
6 Invitation for Prequalification of bidders for Procurement of Part Design, Supply, Installation, Testing and Commissioning of Ballastless track for underground section from Aarey to Cuffe Parade, Ballasted Track in the area of at-grade Aarey station and in the Depot for the Mumbai Metro Line 3. IFP Document MM3-CBS-TWK 11/05/2017 file
7 Transport arrangements for shifting of PAPs in andheri(east) limit from MIDC to Chakala Notice MMRC/Pkg-7/Transport-MIDC/NIT/2 nd call/17 09/05/2017 file
8 Transport arrangements for shifting of PAPs in Andheri (East) limit from MIDC to Chakala Notice MMRC/Pkg-7/Transport-MIDC/NIT/17 22/04/2017 file
9 Construction of depot cum workshop buildings, metro station building, subway, earthwork and all associated works at Aarey colony for the Mumbai Metro Line-3 project Notice MMRDA/MMRC/000748 11/04/2017 file
10 Providing of interior & balance civil works for MMRC's project office building at BKC Notice MMRC/Project Office/BKC/Interior &Balance Civil/NIT/2017 dt. 11/04/2017 11/04/2017 file

Stay Informed

CAPTCHA

Please enter the letters displayed in the image below. If the image is not clear, click on "Can't read the text? Get a new image"

Image CAPTCHA
Top