mmrc icon

Civil

Sr. No. Title Type Tender Ref No Date Of Issue Download
11 Expression of Interest for Semi-Naming & Branding Rights for Mumbai Metro Line 3 Stations EOI MMRCL/Planning/EOI/Semi-Naming Rights 26/12/2019 file
12 Expression of Interest (EOI) for Direct Access to MML3 Stations - MML3 alignment & station locations. Addendum MMRC/Planninng 18/12/2019 file
13 Direct Access to MML3 Stations - MML3 alignment & station locations. Bid Query Response MMRC/Planninng 06/12/2019 file
14 Mumbai Metro Rail Corporation (MMRC) Ltd. Invites online open e-tenders from from eligible agencies for Consultancy Services for Preparation of Detailed Project Report (DPR), Bid preparation, Design Proof checking, for proposed Multi-Level Underground Car Park (for about 700 cars) project in Mantralaya compound, at Nariman Point, Mumbai. RFP MMRC/MML-3/ car park Mantralaya/NIT/2019 20/11/2019 file
15 Mumbai Metro Rail Corporation Ltd (MMRC) Invites online open tenders from eligible agencies for providing Consultancy Services for Preparation of Detailed Project Report (DPR), Bid preparation, Design Proof checking, for proposed Multi-Level Underground Car Park (for about 700 cars) project in Mantralaya compound, at Nariman Point , Mumbai. Notice MMRC/ML-3/ car park Mantralaya/NIT/2019 20/11/2019 file
16 Construction of Secant piling, slope protection and excavation works for Shunting Tracks area, at Ramp of car depot for Mumbai Metro Line-3 (Colaba-Bandra Seepz) Project. Corrigendum - 1 MML-3-CBS-DPT-SP 06/11/2019 file
17 Construction of Secant piling, slope protection and excavation works for Shunting Tracks area, at Ramp of car depot for Mumbai Metro Line-3 (Colaba-Bandra Seepz) Project. Addendum No 1 MML-3-CBS-DPT-SP 06/11/2019 file
18 Expression of Interest (EOI) for Direct Access to Mumbai Metro Line 3 Stations EOI MMRC/Planning 01/11/2019 file
19 EOI for Direct Access to Mumbai Metro Line 3 Stations - Notice Notice MMRC/Planning 01/11/2019 file
20 EOI for Direct Access to MML3 Stations - MML3 alignment & station locations MMRC/Planninng 01/11/2019 file

Stay Informed

1 + 13 =
Top