mmrc icon

Electrical

Sr. No. Title Type Tender Ref No Date Of Issue Download
71 Invitation for Prequalification of bidders for Detailed Design, Engineering, Supply, Installation, Testing and Commissioning of Power Supply works inc luding Receiving Substations, 110 kV Cabling works, Traction Substations, Auxiliary Main Substations, Switching Stations, SCADA System, and Integration with other Systems : Package : 11B Addendum No 1 MM3-CBS-PST-001/2015 19/02/2016 file
72 Invitation for Prequalification of bidders for Detailed Design, Engineering, Supply, Installation, Testing and Commissioning of Overhead Contact Syst em, Auxiliary Substations, 33 kV Cable Distribution Network, and Integration with other Systems : Package : 11A Addendum No 1 MM3-CBS-PST-002/2015 19/02/2016 file
73 Invitation for Prequalification of bidders for Detailed Design, Engineering, Supply, Installation, Testing and Commisioning of Overhead Contact System, Auxiliary Substations, 33 kV Cable Distribution Network, and Integration with other Systems: Package: 11A Notice MM3-CBS-PST-002 05/01/2016 file
74 Procurement of Detailed Design, Engineering, Supply, Installation, Testing and Commisioning of Power Supply works including Receiving Substations, 110 kV Cabling works, Traction Substations, Switching Stations, Auxiliary Main Substations, SCADA System, and Integration with other System: Package: 11B PQ Document MM3-CBS-PST-001 05/01/2016 file
75 Invitation for Prequalification of bidders for Detailed Design, Engineering, Supply, Installation, Testing and Commisioning of Power Supply works including Receiving Substations, 110 kV Cabling works, Traction Substations, Switching Stations, Auxiliary Main Substations, SCADA System, and Integration with other System: Package: 11B Notice MM3-CBS-PST-001 05/01/2016 file
76 Procurement of Detailed Design, Engineering, Supply, Installation, Testing and Commisioning of Overhead Contact System, Auxiliary Substations, 33 kV Cable Distribution Network, and Integration with other Systems: Package: 11A PQ Document MM3-CBS-PST-002 05/01/2016 file
77 Invitation for Prequalification of bidders for Detailed Design, Engineering, Supply, Installation, Testing and Commissioning of Overhead Contact System, Auxiliary Substations, 33 kV Cable Distribution Network, and Integration with other Systems: Package : 11A Pre-Bid Query Response MM3-CBS-PST-002/2015 11/04/2016 file

Stay Informed

CAPTCHA

Please enter the letters displayed in the image below. If the image is not clear, click on "Can't read the text? Get a new image"

Image CAPTCHA
Top