Skip to main content
  • Accessibility And Screen Reader Options
  • English
  • मराठी
  • हिन्दी

A A A

Homepage Logo Mumbai Metro Rail Corporation Ltd. (JV of Govt. of India and Govt. of Maharashtra)

mmrc

Search form
Home MMRC
  • Home
  • About MMRC
    • Know Your Metro
    • Our Vision, Mission & Values
    • Board of Directors
    • Key Management Team
    • Our Organization
    • Managing Director
    • Reports & Documents
    • MOA & AOA
    • Annual Report
  • Project
    • Project Route
    • Project Timeline
    • Project Funding
    • Illustrative Designs
    • Technology
    • Typical Utility Shifting Plan
    • Project Consultants
    • Benefits of Metro Line 3
    • Environmental Benefits
    • Rehabilitation & Resettlement (R&R)
      • FLGRC/SLGRC
      • Public Consultation
      • Final BSES
      • Lottery Result
      • Policy / Project Documents
      • In - situ R&R Office Address
      • BSES Survey Maps
      • Building wise Allotment List
      • Rehabilitation Building Occupation Certificate
    • Projects Reports & Documents
    • NOC
    • Notice
    • Typical Traffic Diversion Plan
  • People Connect
    • FAQ
      • FAQ on Kalbadevi & Girgaon
      • FAQ on Aarey
    • Facts Of Aarey
    • Quick Facts
  • Tenders
    • Civil
    • System
      • Electrical
      • Signalling & Telecom
      • Rolling Stock
      • IT
      • Depot (M&P)
    • Planning
    • Miscellaneous
    • Awarded Contracts
    • MMRC Contractors
    • eTender
    • EOI-MoHUA
  • Media
    • Gallery
      • Photo Gallery
      • Video Gallery
    • News
    • Newsletters
    • MD Speaks
    • Press Releases
    • Social Media
      • Facebook
      • Instagram
      • Twitter
      • Youtube
  • Careers
    • Recruitment
    • Internship Policy
  • RTI/Vigilance
    • RTI (GOI)
    • RTI (GOM)
    • RTI ACT 2005
    • RTI/SANAD
    • PIO/APIO
    • Vigilance
  • Contact Us
    • How to reach us
    • Compliance Officer & Company Secretary
  • Policies
Flash News
  • The MMRCL cautions one and all of Fake appointment letters for Metro-3 corridor The MMRCL cautions one and all of Fake appointment letters for Metro-3 corridor
  • MMRC Control room numbers :- 9136805065 / 7506706477 Pre-Bid Meeting of supply, delivery, plantation and maintenance of advance sized nursery grown trees in Mumbai, Pacakge-20
  1. Home
  2. Lottery-result
  3. Lottery-results
mmrc icon

Lottery-results

MMRC
Date Title
27/11/2018 Lottery Report of Vidyanagari Metro – MAP NO.19
31/08/2018 Commercial Lottery
31/08/2018 Vulnerable Lottery
31/08/2018 Residential Lottery
16/05/2018 Commcial Lottery
16/05/2018 Residential Lottery
16/05/2018 Residential Cum Commercial Lottery
04/12/2017 Lottery Report of Marol Naka - MAP NO. 24
14/11/2017 Commcial Lottery
14/11/2017 Residential
  • 1
  • 2
  • 3
  • 4
  • next ›
MMRC
Shri. Uddhav Thackeray
Shri. Uddhav Thackeray
Hon'ble Chief Minister 
Maharashtra

"I appreciate when projects move ahead with required urgency, to achieve desirable results. The 33.5-km Metro-3 corridor (Colaba-Bandra-SEEPZ) is showing promising speed in this direction. Our aim is to complete the project, highly needed to reduce traffic congestion in Mumbai within the schedule time frame. Metros help reduce carbon footprint as well as pollution. It’s the greenest mass rapid transit system.”

Shri. Devendra Fadanvis
Shri. Venkaiah Naidu
Hon. Minister for Urban Development Department 
Government of India.

"The city of Mumbai requires a ‘metro’ to reclaim its lost glory and I, on behalf of the Centre, promise all help to the State. Implementing infrastructure projects in a city like Mumbai isn’t an easy job. It requires positive attitude. Of course, I’m sure the people of this never-say-stop city will lend their wholehearted support to the 33.5-km long Colaba-Bandra-SEEPZ Metro-3 underground corridor.”

MMRC

Recent News

mmrc
इस माह के अंत तक आएगी भूमिगत मार्ग की पहली ट्रैन
+04 Mar 2022
आय विटनेस भुयारांमध्ये होणार मेट्रोची चाचणी
+03 Mar 2022
First train for underground Metro 3 corridor to reach city by March-end
+03 Mar 2022
महालक्ष्मी, आचार्य अत्रे चौक, वरळी मेट्रो वेगाने
+25 Feb 2022
गिरगावसह काळबादेवीही सुसाट
+19 Feb 2022
भुयारी मेट्रो ३ प्रगतीपथावर
+16 Feb 2022
Previous Pause Next
MMRC

About MMRC

  • Tenders
  • Project
  • News
  • Contact Us
  • eTender
MMRC

Helpful Information

  • Project Route
MMRC

Policy

  • MMRC Green Policy
  • Disclaimer
  • Privacy Policy
MMRC

Other Govt Sites

  • Govt of India
  • MoHUA
  • Indian Railways
  • Govt of Maharashtra
  • MMRDA
  • Other Metros
MMRC
  • mmrc
  • mmrc
  • mmrc
MMRC

MMRC © 2019. All rights are reserved.

  • mmrc
  • mmrc
  • mmrc
Top