Media Centre

    • Dadar
    • Traffic Diversion
    • TBM - 2
    • Dadar
    • Shitladevi
    • Siddhivinayak
    • Dadar secant piling
    • Dadar toolbox
    • Nayanagar TBM - 1
    • Nayanagar TBM - 2
    • Shitladevi box overview
    • Nayanagar Shaft
    • Siddhivinayak Excavation
    • Cage preparation - Sitladevi
    • King post pile - Dadar
    • Siddhivinayak shaft excavation works
    • TBM Nayanagar
    • TBM Nayanagar
    • Aerial view of Nayanagar Site
    • Dadar
    • Dadar Construction Site
    • Aerial view of Siddhivinayak construction site.
    • Aerial view of Siddhivinayak construction site.
    • Segment Casting
    • Casting Yard
    • Shitladevi
    • Shitladevi
    • Siddhivinayak  piling
    • Siddhivinayak  piling
    • Casting Yard
    • Casting Yard
    • Nayanagar Shaft
    • Casting Yard
    • Dadarf road Diversion
    • Shitladevi road diversion
    • Nayanagar Shaft
    • Casting Yard Segments
    • Traffic Diversion Dadar
    • Guide wall casting at Dadar
    • Nayanagar Shaft Excavation
    • Nayanagar Shaft Excavation
    • Segment stacking
    • Traffic Diversion Dadar
    • Utility Diversion Dadar
    • Ring assembly testing
    • Nayanagar Excavation
    • Nayanagar Excavation
    • Nayanagar Excavation
    • Casting Yard segment casting
    • Casting Yard stacking bay
    • Bus queue shelter shifting
    • Shitladevi transplantation
    • Aarey transplantation
    • Nayanagar
    • Siddhivinayak
    • Siddhivinayak
    • Dadar traffic diversion
    • Dadar tree cutting
    • Dadar Utility Diversion
    • Shitladevi road works
    • Casting Yard - Segment casting
    • Dadar road works
    • Dadar & Shitladevi road works
    • Nayanagar micro pile gantry foundation
    • Nayanagar shaft excavation
    • Nayanagar shaft excavation
    • Capping beam Nayanagar
    • Casting Yard moulds
    • Casting Yard
    • Dadar house keeping
    • Nayanagar Micropile
    • Dadar road widening
    • Ravindra Natya Mandir
    • Casting Yard Gantry Foundation
    • Casting Yard segment
    • Dadar road
    • Siddhivinayak piling
    • Siddhivinayak piling
    • Dadar road widening
    • Casting Yard cage preparation
    • Shitladevi Road Excavation
    • Siddhivinayak
    • Siddhivinayak cage building
    • Shitladevi Road Widening
    • Siddhivinayak piling
    • Capping Beam at Nayanagar
    • Road Wideniing works at Dadar
    • Road Widening works at Dadar & Shitladevi
    • Segment Casting Yard
    • Segment Yard
    • Casting Yard
    • Nayanagar
    • Siddhivinayak
    • Sapling Distribution - Project Neighbourhood
    • Tree distribution in Project Neighbourhood
    • Tree Neighbourhood program
    • Project Neighbourhood
    • Tree Plantation
    • Casting Yard Batching Plant setup
    • Casting Yard 1st Segment Demoulding
    100
    Package - 4
    11/07/2018
    • TBM Parts at CSIA International station
    • Domestic NATM Secant pile
    • Domestic North retreival shaft excavation
    • Sahar station box excavation work
    • International retrieval shaft exacavation work
    • Sahar Utility hanging work
    • CSIA International station Excavation work
    • Subway work at Sahar road station
    • CSIA International shaft Launching shaft work
    • Excavation near Launching shaft
    • Excavation at International retrieval shaft
    • Launching shaft base slab at Launching shaft
    • Excavation at Sahar Retrieval shaft
    • Water Sprinkling for dus suppression at CSIA Domestic Station
    • Excavation at CSIA Domestic Station
    • Retrieval shaft excavation at Sahar Road Station
    • Subway construction at Sahar Road Station
    • Launching shaft excavation at Sahar Road Station
    • Launching shaft excavation at Sahar Road Station
    • Launching shaft excavation at Sahar Road Station
    • Launching shaft excavation at Sahar Road Station
    • Excavation at CSIA Domestic Airport Station.
    • Excavation at CSIA Domestic Airport Station.
    • 1800mm water line diversion at CSIA Domestic Airport Station
    • Excavation at CSIA International Airport Station.
    • Excavation at CSIA International Airport Station.
    • Rerrieval shaft excavation at CSIA International Airport Station.
    • Launching shaft excavation at CSIA International Airport Station.
    • Retrieval Shaft excavation at CSIA  International Station
    • Retrieval Shaft excavation at CSIA  International Station
    • Excavation at CSIA Domestic Station
    • Waler beam fixing at CSIA Domestic Station
    • Excavation at CSIA Domestic Station
    • Areal view of CSIA Domestic Station
    • Piling,Excavation & utility support  work at Sahar Road Station
    • Excavation at Sahar Road Station
    • Excavation at Sahar Road Station
    • Subway Sahar Road Station
    • Subway construction at Sahar Road Station
    • Subway at Shahar Road Station
    • Shadow road construction at Sahar road Station
    • Aerial view of CSIA International Station
    • Sahar shadow road construction
    • Retrieval Shaft at CSIA International Station
    • Retrieval Shaft at CSIA International Station
    • Excavation at CSIA Domestic Station
    • Excavation at CSIA Domestic Station
    • Flood wall construction at CSIA Domestic Station
    • Shantinagar area  at Sahar Road Station
    • Excavation at Sahar Road Station
    • Subway at Sahar Road Station
    • Subway Construction at Sahar Road Station
    • Shadow Road Construction at Sahar Road Station
    • CSIA International Station Retrieval Shaft
    • CSIA International Station launching Shaft
    • Excavation at Sahar road Station
    • Excavation at CSIA Domestic Station
    • Excavation at CSIA Domestic Station
    • Excavation at CSIA Domestic Station
    • Aerial View of CSIA Domestic Station
    • Aerial View of CSIA Domestic Station
    • Launching Shaft at CSIA International Station
    • Excavation at CSIA Domestic Station
    • Launching Shaft at CSIA International  Station
    • Retrieval shaft at Sahar Road Station
    • Excavation at CSIA Domestic Station
    • TBM Lowering at Vidyanagari Station
    • TBM Lowering at Vidyanagari Station
    • TBM Lowering at Vidyanagari Station
    • TBM Lowering at Vidyanagari Station
    • TBM Lowering at Vidyanagari Station
    • TBM Lowering at Vidyanagari Station
    • TBM Lowering at Vidyanagari Station
    • Subway at Sahar Road Station
    • Excavation at Sahar Road Station
    • Excavation at Sahar Road Station
    • Excavation at Sahar Road Station
    • Waler beam Erection at CSIA Domestic Station-min
    • Aerial View of CSIA Domestic Station
    • Excavation at CSIA Domestic Station
    • Excavation at CSIA Domestic Station
    • Capping beam work at CSIA Domestic Station
    • Drain Work at Sahar Shadow road
    • Launching Shaft Excavation at CSIA International Station
    • Capping beam construction at CSIA International Station
    • Retieval Shaft at CSIA International Station
    • Excavation at Sahar Road Station
    • Excavation at Sahar Road Station
    • Excavation at Sahar Road Station
    • Launching Shaft at CSIA International Station
    • Piling at CSIA International Station
    • Capping Beam at CSIA International Station
    • Labour colony at Construction Depot - Copy
    • Excavation at CSIA Domestic Station
    • Excavation at CSIA Domestic Station
    • Retrieval Shaft at Sahar Road Station
    • Retrieval Shaft at Sahar Road Station
    • Launching Shaft  at Sahar Road Station
    • Subway at Sahar Road Station
    99
    Package - 6
    08/07/2018
    • Cuffe Parade Metro Station
    • Vidhan Bhavan Metro Station
    • Churchgate Metro Station
    • Cuffe Parade Metro Station
    • Hutatma Chowk Metro Station
    • Cuffe Parade Metro Station
    • Churchgate Metro Station
    • Cuffe Parade Metro Station
    • Hutatma Chowk Metro Station
    • Vidhan Bhavan Metro Station
    • Depot area at MIDC land Colaba
    • Commencement of strut erection at Launch Shaft.
    • Excaavation & Structural steel works at Cuffe Parade
    • Hutatma Chowk Metro Station
    • Mumbai Metro Casting Yard
    • End deck open to traffic for Vidhan Bhavan
    • Piling works at on-road portion in Vidhan Bhavan Station after traffic diversion
    • Works for Churchgate station at Jamsetjee Tata road
    • Piling works at DN Road for Hutatma Chowk station after traffic diversion
    • Excavation at off-road portion of Vidhan Bhavan Station
    • Vidhan Bhavan Metro Station
    • Churchgate Station
    • Vidhan Bhavan Station
    • Cuffe Parade Station
    • Hutatma Chowk station
    • Churchgate Station
    • Cuffe Parade Station
    • Churchgate Station
    • Cuffe Parade Station
    • Cuffe Parade Station
    • Vidhan Bhavan Station
    • Churchgate Station
    • Vidhan Bhavan Station
    • Hutatma Chowk Station
    • Cuffe Parade Station
    • Cuffe Parade Station
    • Hutatma Chowk Station
    • Churgate Station
    • Cuffe Parade Station
    • Cuffe Parade Station
    • Hutatma Chowk Station
    • Hutatma Chowk Station
    • Cuffe Parade Metro Station
    • Hutatma Chowk Metro Station
    • Vidhan Bhavan Station
    • Vidhan Bhavan Station
    • Hutatma Chowk Metro Station
    • Vidhan Bhavan Metro Station
    • Vidhan Bhavan Metro Station
    • Traffic deck at DN road (Hutatma Chowk Station) - Open to traffic
    • Excavation in progress at Vidhan Bhavan
    • Deck getting ready to open for traffic at DN Road - Hutatma Chowk Station
    • Traffic deck ready in front of Taj Vivanta - Cuffe Parade Station
    • Works at Churchgate Station at Jamsetjee Tata Road
    • Double layer stacking of rings at pre-cast yard
    • Excavation at Vidhan Bhavan Station
    • Cuffe Parade Metro Station
    • Hutatma Metro station
    • Vidhan Bhavan Metro Station
    • Mumbai Metro casting yard
    • Churchgate Station
    • Vidhan Bhavan Metro Station
    • Vidhan Bhavan Metro Station
    • Hutatma Chowk Metro Station
    • Hutatma Chowk Metro Station
    • Cuffe Parade Metro Station
    • Churchgate Station
    • Churchgate Station
    • Cuffe Parade Metro Station
    • Cuffe Parade Metro Station
    • Vidhan Bhavan Metro Station
    • Cuffe Parade Metro Station
    • Hutatma Chowk Metro Station
    • Churchgate Station
    • Vidhan Bhavan Metro Station
    • Cuffe Parade Metro station
    • Cuffe Parade Metro station
    • Hutatma Chowk Metro Station
    • Hutatma Chowk Metro station
    • Vidhan Bhavan Metro Station
    • Vidhan Bhavan Metro Station
    • Churchgate Station
    • Hutatma Chowk Metro Station
    • Hutatma Chowk Metro Station
    • Cuffe Parade Metro Station
    • Cuffe Parade Metro Station
    • Excavation works at Launch Shaft at Cuffe Parade
    • Traffic decking works at DN Road (Hutatma Chowk Station)
    • Precast Yard
    • Vidhan Bhavan Station
    • Hutatma Chowk Station
    • Churchgate Station
    • Excavation for Launch Shaft
    • Pipe Jacking
    • Works at Churchgate Station
    • Works at Vidhan Bhavan Station
    • Piling works at Churchgate Station
    • Works near heritage building at DN Road for Hutatma Chowk Station
    • Churchgate Station
    • Training to crane operators on safe lifting methods by third party.
    • Supporting existing utilities
    101
    Package - 1
    01/07/2018
    • Bandra Station-Traffic diversion (G19-25)
    • Dharavi Station-King post
    • Bandra Station-South shaft
    • Dharavi Station-Secant piling(Ancillary)
    • Vidyanagari Station 600mm Pipe line
    • Bandra Station Road construction - Junction
    • Dharavi Station Road construction North junction
    • Dharavi Station Road construction South junction
    • Vidyanagari Station Struts
    • Santacruz Station Traffic Diversion (South End)
    • PCC Casting
    • 600mm Pipeline Diversion - East wall
    • East wall -1200mm Pipeline
    • Flood wall construction - West wall
    • PCC Casting - Launching shaft
    • T61 - Mucking
    • Bandra Station north shaft
    • Dharavi station gabion wall
    • Dharavi station piling east wall
    • New Police Station - Santacruz Station
    • North Shaft
    • North Shaft - Vidyanagari Station
    • TBM lowering has commenced at Vidyanagri North Launching shaft
    • TBM lowering has commenced at Vidyanagri North Launching shaft
    • TBM lowering has commenced at Vidyanagri North Launching shaft
    • SWD Pipe laying(Santacruz)
    • Caping beam(BKC)
    • Secant Piling at Station Box
    • Capping Beam (Dharavi)
    • Piling (BKC)
    • Launching Shaft (Vidyanagari)
    • Gabion Wall(Dharavi)
    • Excavation of Launching Shaft Ongoing at Vidyanagari Station
    • Labour Camp Erection ongoing at Vidyanagari Station
    • Piling Work ongoing at Santacruz Station
    • Piling Work ongoing at Dharavi Station
    • Mangrooves Area Cleaning on going at BKC Station
    • BKC - Piling, Backfilling
    • BKC Project Office - Flooring Works
    • Santacruz-Micro Piling
    • Vidyanagri - Road for Traffic Diversion
    • Vidyanagri North Shaft - Excavation 1
    • Vidyanagri North Shaft - Excavation 2
    • Santacruz-Secant Piling
    • Dharavi - Secant Piling
    • Dharavi - Reinforcement fixing for Capping Beam
    • BKC Station Grid
    • Excavation work ongoing at Vidyanagari Station
    • Piling work ongoing at Dharavi Station
    • Piling Work ongoing at Santacruz Station
    • BKC - North Launching Shaft
    • BKC Steel Yard - Batching Plant Erection Ongoing
    • BKC - Project Office
    • Vidyanagri - Piling (Gr 1 to 6 - West)
    • Dharavi - Pile Chipping for Capping Beam (Gr 1 to 6 - Nallah Side)
    • Dharavi - 2nd Piling Rig Mobilised
    • Vidya Nagari North Shaft - Pile Chipping for Capping Beam Preparation
    • Dharavi - Piling Activity at Gr 10-17 (Nallah Side)
    • Vidya Nagari - Piling Activity in North Shaft
    • Project office progress
    • Vidya Nagari - RCC work ongoing for Road Diversion
    • Tree cutting - Santacruz
    • Vidya Nagari North Shaft - Pile Chipping for Capping Beam Preparation
    • BKC - Capping Beam at North Launching Shaft
    • Dharavi - Piling at Grid 1-6 (West)
    • Vidyanagri - 1200 mm Water Line - Shutdown Preparation
    • Vidyanagri - Cable Anchor Insertion
    • BKC - Trial Run Traffic Diversion
    • Dharavi - Pile Concreting
    • Dharavi - Pile Concreting
    • Vidyanagri - 1200mm dia Water Line Encasing
    • Vidyanagri - Capping Beam
    • Vidyanagri - GSB for Road Diversion
    • Piling work ongoing at BKC Station
    • Piling work on going at Dharavi Station
    • Welding and cutting work on going at Vidyanagari Station.
    • Cable Anchoring - Vidyanagri North Shaft
    • Piling - BKC North Shaft
    • Exacavation for Drain on going at Dharavi Station
    • Santacruz station wall capping beam
    • Santacruz station wst wall micro pile
    • Vidyanagari station east wall
    • Santacruz Station Traffic Diversion (North End)
    83
    Package - 5
    01/07/2018
    • Girgaon - Phase 1, 2 & 6
    • Girgaon - Phase - 9
    • Grant Road - Phase - 1&4-1
    • Girgaon - Phase - 11 - Junction.
    • Grant Road - Phase - 1&4
    • CST - Rock Breaking in Station Box
    • CST - Rock Breaking in Station Box
    • Grant Road - Erection of Extra support for Raja Terrace
    • Grant Road - King Post area breaking for Erection of Built up section
    • Girgaon - Construction of Retaining Wall
    • Grant Road - Secant Piling in Phase 6
    • Grant Road - Secant Pile breaking in Phase 3
    • Grant Road - Secant Piling in Phase 4
    • CST - Station Box Excavation
    • Girgaon - Phase 2 & 3
    • Girgaon - Piling at Phase 9
    • Tunnel 1 - Boring by Vaitana-1
    • Tunnel 1 - Denotation of Tunnel Utilities
    • CST - Station Box
    • CST - Retrieval Shaft Strut Erection
    • CST - Excavation in Station Box
    • Girgaon - Retaining Wall and Utility Diversion in Phase 9
    • Girgaon - MTNL Telephone line diversion
    • CST - Launching-Shaft - Operation of Locomotive begins
    • CST - Launching-Shaft - Lowering of Locomotive
    • CST - Tunneling Ring Building
    • CST - Ring Building in progress
    • Girgaon - Wheel wash bay
    • Grant-Road - Secant Piling & Muck stacking in Muck Bin
    • WTC - Fabrication of Struts
    • WTC - Fabrication of Main Drive Sleepers
    • CST - Balance-Station Box
    • CST - Launching Shaft - base Plate fixing for cradle
    • Casting Yard - Transportation of Segment for Micro Finishing
    • Casting Yard - Micro Finished Segment
    • Grant Road - Preparation for Erection of Railing for Public Walk way
    • Grant Road - King Post boring - KP 42
    • CST - TBM - Initial Drive inprogress
    • CST - TBM 1 - Boring
    • Grant Road - Trail Trench for King Post
    • Girgaon - Secant Pile Boring - P132
    • CST - Safety Training on Gas Cutting
    • CST - Safety Training on Gas Cutting
    • CST - Fixing of Reinforcement Cage for Reaction frame
    • Grant Road - King Post Welding
    • Casting Yard - Vacuum Lifting for Segment
    • Casting Yard - Vacuum Lifting for Segment
    • Casting Yard - Concreting for Segment
    • Casting Yard - Concreting for Segment
    • Grant Road - Lying of new sewer line
    • Girgaon - Mobilization of RIG
    • Girgaon - Polymer Tank Setup
    • WTC - Welding for Strut for Preload
    • WTC - bracing in Strut
    • CST - Mucking by Muck basket
    • Grant Road - Utility Diversion at Phase 1
    • Girgaon - Excavation for Utility Diversion in progress at Phase 1
    • CST - Launching Shaft
    • Grant Road - Arial View of Phase 3
    • Grant Road - Arial View of Phase 1
    • Girgaon - Barricading in Phase 3
    • CST - Mucking by Muck basket
    • CST - Cleaning of Muck between Pile
    • CST - Foundation for Chiller Tower
    • CST - Launching Shaft
    • CST - Muck Bin Side wall
    • Casting Yard - Cylinder Stacking
    • Casting Yard - Segment Reinforcement Welding
    • Casting Yard - Reinforcement Fixed in Segment
    • Casting Yard - Segment Reinforcement Welding
    • Casting Yard - Segment Reinforcement Welding
    • Casting Yard - Segment Reinforcement Welding
    • TBM - FAT - T58
    • Casting Yard - Segment Stacking
    • TBM - FAT
    • Casting yard - Preparatory work for Segment casting
    • Casting Yard - Lowering of Cage
    • Casting Yard - Micro-Finishing
    • Grant Road - Traffic Diversion
    • Grant Road - Traffic Diversion
    • Grant Road - Traffic Diversion
    • CST - Launching Shaft Area
    • CST - Load cell fixing between struts
    • CST - packing Concrete for waler
    • Grant Road - Trail Run for traffic diversion
    • Grant Road - Trail Run for traffic diversion
    • Grant Road - Trail Run for traffic diversion
    • Grant Road - Secant Pile Cage lowering
    • Grant Road - Utility Supporting wall
    • Grant Road - Utility Supporting wall
    • CST - Leveling for Crane Pad foundation
    • Grant Road -  MMRC's MD visit to Grant Road Site
    • CST - MMRC's MD visit to CST site Launching Shaft
    • Wadala - Segment Curing by Gunny Bags
    • Wadala - Aggregate Bin
    • CST - Muck Bin
    • CST - 1st Level Strut
    • CST - 1st Level Strut
    • CST - Preparatory work for Tree Transplantation
    • CST - Preparatory work for Tree Transplantation
    • CST - Transportation of Tree for Transplantation
    • Wadala - Master Ring Assembly
    • Wadala - Master Ring Assembly
    103
    Package - 2
    22/06/2018
    • Commencement of initial drive for the first TBM ( WAINGANGA-1) of Package-07
    • The TBM will bore the tunnel from Pali Ground, Marol to CSIA-T2
    • Commencement of initial drive for the first TBM ( WAINGANGA-1) of Package-07
    3
    Commencement of initial drive for the first TBM ( WAINGANGA...
    08/01/2018
    • VAINGANGA - 1 Assembling at Mid-Shaft
    • VAINGANGA - 1 Parts lowering at Mid-Shaft
    • Excavation works at Marol Naka Station
    • Excavation works at Marol Naka Station
    • Excavation works at MIDC Station
    • Excavation works at MIDC Station
    • Excavation works at MIDC Station
    • Excavation works at MIDC Station
    • Piling & Capping Beam works at MIDC Station
    • Piling & Capping Beam works at MIDC Station
    • Plung column works at Marol Naka Station
    • Piling works at Marol Naka Station
    • Piling work in progress at MIDC Station
    • Gantry rail fixing work in progress at MIDC Station
    • Excavation work in progress at MIDC Station
    • Mid Shaft.
    • Mid Shaft.
    • Marol Naka Station.
    • Marol Naka Station.
    • Marol Naka Station
    • Piling work in progress at MIDC station
    • MIDC excavation work
    • Piling & Capping beam work in progress at MIDC Station
    • MIDC station police quarters work area
    • Arial view of mid shaft (Pali Ground)
    • Precast segment curing at Casting Yard
    • Precast segment curing at Casting Yard
    • Segment mould at mould stock yard in Casting Yard
    • Utility shifting work in progress at MIDC Station
    • Line Drilling work is in progress at Mid Shaft
    • 45T Gantry crane erection work at Mid Shaft
    • Sedimentation tank rebar fixing work in Casting Yard
    • 45T Gantry crane erection work at Mid Shaft
    • Muck pit foundation work in in progress at Mid Shaft
    • Excavation work in progress at MIDC Station
    • Fabrication work in progress at Marol Naka Station
    • Capping beam work in progress at MIDC Station
    • Pile No. P297 boring is in progress by 2nd rig in SEEPZ Station
    • Muck pit excavation work is in progress at ramp (Launching Shaft area)
    • MIDC ESIC Area
    • Kingpost work in progress at MIDC Station
    • 3rd pour of 2nd ring beam rebar fixing completed at Mid Shaft
    • Line drilling is in progress at Mid Shaft
    • Casting work is in progress at 2nd pour of 2nd ring beam
    • Segment mould checking work beforle casting at Casting Yard
    • Rebar cage fabrication work at SEEPZ Station
    • Pile No. S324 boring work is in progress at SEEPZ Station
    • 45T gantry erection is in progress at Mid Shaft
    • Levelling work is in progress at ramp
    • Levelling work is in progress at ramp
    • Cage lowering work for pile no. S324 at SEEPZ Station
    • Trial trench work is in progress at ERTL building in Seepz station
    • Line drilling work is in progress at Mid Shaft
    • Muck disposal is in progress by crawler crane at Mid Shaft
    • Second ring beam 1st floor casting completed at Mid Shaft
    • Second ring beam rebar fixing work is in progress at Mid Shaft
    • Utility identification & shifting in progress at MIDC station
    • Utility identification & shifting in progress at MIDC station
    • Backfilling work is in progress at Ramp Area
    • Disel shed fabrication work is in progress at Casting Yard
    • Earth dressing & levelling work is in progress at ramp area
    61
    Package - 7
    02/01/2018
    • TBM lowered at Vidyanagari launching shaft.
    • Cutter head of Godavari-1 TBM lowered at Vidyanagari launching shaft.
    • Cutter head of Godavari-1 TBM lowered at Vidyanagari launching shaft.
    • U.P.S. Madan, MC, MMRDA; Deepak Kapoor, CEO, SRA; Milind Mhaiskar, VP and CEO, MAHAD; Sumant Bhange, CO RR Board MAHADA along with Ashwini Bhide, MD MMRC and other senior officials at Vidyanagari lanching shaft witnessing the lowering of cutter head.
    • U.P.S. Madan, MC, MMRDA; Deepak Kapoor, CEO, SRA; Milind Mhaiskar, VP and CEO, MAHAD; Sumant Bhange, CO RR Board MAHADA along with Ashwini Bhide, MD MMRC and other senior officials at Vidyanagari lanching shaft witnessing the lowering of cutter head.
    • Cutter head of Godavari-1 TBM lowered at Vidyanagari launching shaft.
    6
    Lowering of TBM at Vidyanagari launching shaft
    21/12/2017
    • Ms. Ashwini Bhide, MD, MMRC along with team MMRC witnessing the first excavation of Mumbai Metro Line - 3
    • Ms. Ashwini Bhide, MD, MMRC along with team MMRC witnessing the first excavation of Mumbai Metro Line - 3
    • Ms. Ashwini Bhide, MD, MMRC along with team MMRC witnessing the first excavation of Mumbai Metro Line - 3
    • Ms. Ashwini Bhide, MD, MMRC along with team MMRC witnessing the first excavation of Mumbai Metro Line - 3
    4
    Commencement of tunneling at Nayanagar
    10/11/2017