Photo Gallery

    • MD. MMRC, Ms. Ashwini Bhide during the second TBM breakthrough at SEEPZ
    • MMRC completes tunneling of about 15 KMs
    • Wainganga-2 from PKG 7 makes a second breakthrough at SEEPZ station after tunneling a distance of 568 mtrs over 125 days
    • MMRC accomplishes second tunnel breakthrough at SEEPZ
    • MD. MMRC, Ms. Ashwini Bhide along with Dir. Projects, Mr. S.K.Gupta and Dir. Systems, Mr. A.A. Bhatt witnessed the Second TBM breakthrough at SEEPZ
    5
    Second TBM Breakthrough of Mumbai Metro - 3
    26/12/2018
    • 1m Dia. Twin pipe for storm water drain diversion at Santacruz Metro Station
    • 1800 mm Dia. water line diversion at CSIA Domestic Station
    • 900 mm Storm water drain at CSIA Domestic Station
    • Suspender Erection at Utility Support System at Sahar Road Station
    • Tata Oil filled cable supporting in On Road portion at Vidhan Bhavan Station
    • Excavation progress in Grid 19-24 at Hutatma Chowk Station
    • Cable Tray Arrangement supported on Capping Beam for TATA Submarine Cable diversion at Dharavi Station
    • Hanging Arrangement across the Station for Diversion of TATA Submarine Cables at BKC Station
    • Multiple Water Pipelines of Dia (2.7m,-2.4m,-1.45m,-0.6m) Supported by Suspended Erection at Sahar Road Station
    • SEEPZ
    • Girgaon Station Phase - 05 Trenching for utility diversion
    • Support of xx mm Dia Water Pipe Line Beneath the station Box at Worli Station
    • Support of xx mm Dia Water Pipe Line Beneath the station Box at Worli Station
    • Truss Arrangement to House Multiple Mega Utilities at Sahar Road Station
    • UGC07 SEEPZ Station 900 mm Dia waterline supporting works.
    • Vidyanagari Station
    16
    Utility Shifting
    15/11/2018
    • Commencement of initial drive for the first TBM ( WAINGANGA-1) of Package-07
    • The TBM will bore the tunnel from Pali Ground, Marol to CSIA-T2
    • Commencement of initial drive for the first TBM ( WAINGANGA-1) of Package-07
    3
    Commencement of initial drive for the first TBM ( WAINGANGA...
    08/01/2018
    • TBM lowered at Vidyanagari launching shaft.
    • Cutter head of Godavari-1 TBM lowered at Vidyanagari launching shaft.
    • Cutter head of Godavari-1 TBM lowered at Vidyanagari launching shaft.
    • U.P.S. Madan, MC, MMRDA; Deepak Kapoor, CEO, SRA; Milind Mhaiskar, VP and CEO, MAHAD; Sumant Bhange, CO RR Board MAHADA along with Ashwini Bhide, MD MMRC and other senior officials at Vidyanagari lanching shaft witnessing the lowering of cutter head.
    • U.P.S. Madan, MC, MMRDA; Deepak Kapoor, CEO, SRA; Milind Mhaiskar, VP and CEO, MAHAD; Sumant Bhange, CO RR Board MAHADA along with Ashwini Bhide, MD MMRC and other senior officials at Vidyanagari lanching shaft witnessing the lowering of cutter head.
    • Cutter head of Godavari-1 TBM lowered at Vidyanagari launching shaft.
    6
    Lowering of TBM at Vidyanagari launching shaft
    21/12/2017
    • Ms. Ashwini Bhide, MD, MMRC along with team MMRC witnessing the first excavation of Mumbai Metro Line - 3
    • Ms. Ashwini Bhide, MD, MMRC along with team MMRC witnessing the first excavation of Mumbai Metro Line - 3
    • Ms. Ashwini Bhide, MD, MMRC along with team MMRC witnessing the first excavation of Mumbai Metro Line - 3
    • Ms. Ashwini Bhide, MD, MMRC along with team MMRC witnessing the first excavation of Mumbai Metro Line - 3
    4
    Commencement of tunneling at Nayanagar
    10/11/2017
    • MMRC Rehabilitation and Resettlement office in Kalbadevi
    • Mr. R. Ramana, Executive Director (Planning) inaugrating the Rehabilitation and Resettlement office in Kalbadevi
    • Mr. R. Ramana, Executive Director (Planning) being felicitated
    • Mr. R. Ramana, Executive Director (Planning) being felicitated
    • Team MMRC present for the occassion of inaugration of Rehabilitation and Resettlement office in Kalbadevi
    • Team MMRC present for the occassion of inaugration of Rehabilitation and Resettlement office in Kalbadevi
    6
    MMRC inaugurates Rehabilitation and Resettlement office in...
    10/05/2017
    • Package - 1 Project team distributed saplings to the public under Project Neighbourhood
    • Package - 1 Project team distributed saplings to the public under Project Neighbourhood
    • Package - 1 Project team distributed saplings to the public under Project Neighbourhood
    • Package - 1 Project team distributed saplings to the public under Project Neighbourhood
    • Package - 1 Project team distributed saplings to the public under Project Neighbourhood
    • Package - 2 Project team distributed saplings to the public under Project Neighbourhood
    • Package - 2 Project team distributed saplings to the public under Project Neighbourhood
    • Package - 2 Project team distributed saplings to the public under Project Neighbourhood
    • Package - 2 Project team distributed saplings to the public under Project Neighbourhood
    • Package - 3 Project team distributed saplings to the public under Project Neighbourhood
    • Package - 3 Project team distributed saplings to the public under Project Neighbourhood
    • Package - 3 Project team distributed saplings to the public under Project Neighbourhood
    • Package - 3 Project team distributed saplings to the public under Project Neighbourhood
    • Package - 3 Project team distributed saplings to the public under Project Neighbourhood
    • Package - 4 Project team distributed saplings to the public under Project Neighbourhood
    • Package - 4 Project team distributed saplings to the public under Project Neighbourhood
    • Package - 4 Project team distributed saplings to the public under Project Neighbourhood
    • Package - 4 Project team distributed saplings to the public under Project Neighbourhood
    • Package - 5 Project team distributed saplings to the public under Project Neighbourhood
    • Package - 5 Project team distributed saplings to the public under Project Neighbourhood
    • Package - 5 Project team distributed saplings to the public under Project Neighbourhood
    • Package - 5 Project team distributed saplings to the public under Project Neighbourhood
    • Package - 6 Project team distributed saplings to the public under Project Neighbourhood
    • Package - 6 Project team distributed saplings to the public under Project Neighbourhood
    • Package - 6 Project team distributed saplings to the public under Project Neighbourhood
    25
    Project Neighbourhood - A Green Initiative by MMRC
    07/04/2017
    • MD & Director (Project), MMRC with team before the 6km Dream Run.
    • The contingent led by MD, MMRC
    • MD, MMRC leading the team during Dream Run.
    • MD, MMRC & Team keeping up the pace with other runners.
    • MD, MMRC & Team keeping up the pace with other runners.
    • Team MMRC creating awarness amongst people about Metro 3
    • MD, MMRC & Team successfully completes 6km Dream Run
    • MD, MMRC & Team in high spirits after completing the 6km Dream Run
    • MD, MMRC & Team post Dream Run
    9
    Dream Run of MMRC in Mumbai Marathon
    16/01/2017
    • Mrs. Ashwini Bhide presenting boquet to Dr. E. Sreedharan
    • Mrs. Ashwini Bhide presenting token of appreciation to Dr. E. Sreedharan
    • Mrs. Ashwini Bhide, MD MMRC with Dr. E. Sreedharan
    • Mrs. Ashwini Bhide, MD MMRC addressing at the occasion
    • Dr. E. Sreedharan addressing the Engineers of MMRC
    • Dr. E. Sreedharan interacting with the Engineers of MMRC
    • (From Left to Right) ; Mr. A. A. Bhatt, Director (Systems) MMRC, Mrs. Ashwini Bhide (MD) MMRC, Mr.R. Ramana, Executive Director (Planning) with Dr. E. Sreedharan
    • Senior Officials of MMRC, Engineers of MMRC and Genral Consultant at the interactive session
    • Dr. E Sreedharan guiding the Higher Official of MMRC and Civil Contractor
    9
    A talk by Dr. E. Sreedharan
    17/11/2016
Top