Skip to main content
  • Accessibility And Screen Reader Options
  • English
  • मराठी
  • हिन्दी

A A A

Homepage Logo Mumbai Metro Rail Corporation Ltd. (JV of Govt. of India and Govt. of Maharashtra)

mmrc

Search form
Home MMRC
  • Home
  • About MMRC
    • Know Your Metro
    • Our Vision, Mission & Values
    • Board of Directors
    • Key Management Team
    • Our Organization
    • Reports & Documents
    • MOA & AOA
    • Annual Report
  • Project
    • Project Route
    • Project Timeline
    • Project Funding
    • Illustrative Designs
    • Technology
    • Typical Utility Shifting Plan
    • Project Consultants
    • Benefits of Metro Line 3
    • Rehabilitation & Resettlement (R&R)
      • FLGRC/SLGRC
      • Public Consultation
      • Final BSES
      • Lottery Result
      • Policy / Project Documents
      • In - situ R&R Office Address
      • MHADA NOC Annexure
      • BSES Survey Maps
      • Building wise Allotment List
    • Projects Reports & Documents
    • NOC
    • Notice
    • Typical Traffic Diversion Plan
  • People Connect
    • FAQ
      • FAQ on Kalbadevi & Girgaon
      • FAQ on Aarey
    • Facts Of Aarey
    • Quick Facts
  • Tenders
    • Civil
    • System
      • Electrical
      • Signalling & Telecom
      • Rolling Stock
      • IT
      • Depot (M&P)
    • Planning
    • Miscellaneous
    • Awarded Contracts
    • MMRC Contractors
    • eTender
    • EOI-MoHUA
  • Media
    • Gallery
      • Photo Gallery
      • Video Gallery
    • News
    • Newsletters
    • MD Speaks
    • Press Releases
    • Social Media
      • Facebook
      • Instagram
      • Twitter
      • Youtube
  • Careers
    • Recruitment
    • Internship Policy
  • RTI/Vigilance
    • RTI (GOI)
    • RTI (GOM)
    • RTI ACT 2005
    • RTI/SANAD
    • PIO/APIO
    • Vigilance
  • Contact Us
    • How to reach us
    • Compliance Officer & Company Secretary
  • Policies
Flash News
  • Selection of Consultant for Bid Process Management of Non-Fare Box Revenue Streams for Mumbai Metro Line-3 [2nd Call] Selection of Consultant for Bid Process Management of Non-Fare Box Revenue Streams for Mumbai Metro Line-3 [2nd Call]
  • Pre-Bid Meeting of supply, delivery, plantation and maintenance of advance sized nursery grown trees in Mumbai, Pacakge-20 Pre-Bid Meeting of supply, delivery, plantation and maintenance of advance sized nursery grown trees in Mumbai, Pacakge-20
  • MMRC Establishes Disaster Control Room MMRC Establishes Disaster Control Room
  • Procurement Projection for MMRC Procurement projection for MMRC
  1. Home
  2. Media
  3. Gallery
  4. Photo Gallery
MMRC logo

Photo Gallery

MMRC
MMRC
    • The workshops were conducted between 9-11 July by MMRC & ORF
    • This helped participants streamline objectives & approach towards solutions.
    • Glimpses of the workshop conducted by MMRC & ORF
    • Glimpses of the workshop conducted by MMRC & ORF
    • Glimpses of the workshop conducted by MMRC & ORF
    • Glimpses of the workshop conducted by MMRC & ORF
    • Glimpses of the workshop conducted by MMRC & ORF
    • Glimpses of the workshop conducted by MMRC & ORF
    Mentoring workshops conducted by MMRC for Station Area...
    12/07/2019
    8
    • Tree Plantation at Aarey Colony
    • Tree Plantation at Aarey Colony
    • Tree Plantation at Aarey Colony
    • Tree Plantation at Aarey Colony
    • Tree Plantation at Aarey Colony
    • Tree Plantation at Aarey Colony
    • Tree Plantation at Aarey Colony
    • Tree Plantation at Aarey Colony
    • Tree Plantation at Aarey Colony
    • Tree Plantation at Aarey Colony
    • Tree Plantation at Aarey Colony
    MMRCL Tree Plantation at Aarey Colony
    05/07/2019
    11
    • Tree Plantation at Naval Land - Kanjurmarg
    • Tree Plantation at Naval Land - Kanjurmarg
    • Tree Plantation at Naval Land - Kanjurmarg
    • Tree Plantation at Naval Land - Kanjurmarg
    MMRCL Tree Plantation at Naval Land Kanjurmarg
    05/07/2019
    4
    • Mr. R. Ramana , ED (Planning), MMRC, addresses participating students at the workshop that kicks off competition on station area planning & management for MumbaiMetro3 jointly organised by MMRC and ORF Mumbai.
    • 52 teams 238 Innovative minds from 13 Engineering & Architecture colleges across Mumbai participating in the competition.
    • Mr. R. Ramana , ED (Planning), MMRC says, ❝MMRC is happy to take this initiative because learning never stops and who you learn from has no definition.❞
    Glimpses of workshop organised that kicks off competition...
    21/06/2019
    3
    • Fifth TBM breakthrough for Mumbai Metro 3 corridor at Chhatrapati Shivaji Maharaj International Airport- T2 metro station.
    • Starting it's course under Metro Line 1 at MarolNaka The 92 mtr long TBM Wainganga-3 tunneled at an average of 4.2 mtrs daily through the rocky strata made of Basalt, volcanic Breccia shaping the tunnel with 937 RCC cement rings.
    • Starting it's course under Metro Line 1 at MarolNaka The 92 mtr long TBM Wainganga-3 tunneled at an average of 4.2 mtrs daily through the rocky strata made of Basalt, volcanic Breccia shaping the tunnel with 937 RCC cement rings.
    Fifth TBM breakthrough for Mumbai Metro 3 corridor.
    13/02/2019
    3
    • Tunneling by New Austrian Tunneling Method (NATM ) commenced.
    • Tunneling commenced at the south end of BKC Station for the 153m long tunnel below Mithi River.
    • Tunneling commenced at the south end of BKC Station for the 153m long tunnel below Mithi River.
    • This will facilitate stabling of spare train during operations and also act as a Sick Siding.
    Tunneling by New Austrian Tunneling Method (NATM )...
    06/02/2019
    4
    • MMRC successfully conducts its first twin tunnel breakthrough at Dadar Metro station. TBM Krishna 1 and 2 have tunneled from Nayanagar to Dadar.
    • First Twin Tunnel Breakthrough of Mumbai Metro Line - 3 Project
    • A Herrenknecht make TBMs Krishna 1 & 2 equipped with Earth Pressure Balance Tech tunneled their way through the rocky strata made of Basalt, Breccia & tuff for 506 & 479 days.
    • With this feat MMRC achieves 35% of total work completion which includes 18Kms of tunneling.
    First Twin Tunnel Breakthrough of Mumbai Metro Line - 3...
    31/01/2019
    4
    • This MMRC Art Initiative comprises of paintings done by students from Sir JJ School Of Arts
    • This MMRC Art Initiative comprises of paintings done by students from Sir JJ School Of Arts
    • This MMRC Art Initiative comprises of paintings done by students from Sir JJ School Of Arts
    • This MMRC Art Initiative comprises of paintings done by students from Sir JJ School Of Arts
    • This MMRC Art Initiative comprises of paintings done by students from Sir JJ School Of Arts
    • This MMRC Art Initiative comprises of paintings done by students from Sir JJ School Of Arts
    • This MMRC Art Initiative comprises of paintings done by students from Sir JJ School Of Arts
    MMRCL Calendar 2019
    01/01/2019
    7
    • MD. MMRC, Ms. Ashwini Bhide along with Dir. Projects, Mr. S.K.Gupta, Dir. Systems, Mr. A.A.Bhatt, Dir. Finance, Mr. Abodh.Khandelwal & ED. Planning, Mr. R.Ramana unveiled the calendar for the year 2019
    • MD. MMRC, Ms. Ashwini Bhide along with senior officials of MMRC
    • MD. MMRC, Ms. Ashwini Bhide along with senior officials of MMRC
    Unveiling of MMRCL Calendar 2019
    01/01/2019
    3
  • ‹ previous
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • next ›
MMRC
Shri. Uddhav Thackeray
Shri. Uddhav Thackeray
Hon'ble Chief Minister 
Maharashtra

"I appreciate when projects move ahead with required urgency, to achieve desirable results. The 33.5-km Metro-3 corridor (Colaba-Bandra-SEEPZ) is showing promising speed in this direction. Our aim is to complete the project, highly needed to reduce traffic congestion in Mumbai within the schedule time frame. Metros help reduce carbon footprint as well as pollution. It’s the greenest mass rapid transit system.”

Shri. Devendra Fadanvis
Shri. Venkaiah Naidu
Hon. Minister for Urban Development Department 
Government of India.

"The city of Mumbai requires a ‘metro’ to reclaim its lost glory and I, on behalf of the Centre, promise all help to the State. Implementing infrastructure projects in a city like Mumbai isn’t an easy job. It requires positive attitude. Of course, I’m sure the people of this never-say-stop city will lend their wholehearted support to the 33.5-km long Colaba-Bandra-SEEPZ Metro-3 underground corridor.”

MMRC

Recent News

mmrc
मेट्रो - ३ चे सरासरी ८५ टक्के काम पूर्ण
+08 Apr 2021
मेट्रो - ३ : ५०.३ किमीचे भुयारीकरण पूर्ण
+26 Feb 2021
मेट्रो मार्गावर 'वननिर्मिती'
+26 Feb 2021
गोरेगांव की हवा होगी शुद्ध
+26 Feb 2021
मेट्रो ३च्या पाच पॅकेजमधील ९३ टक्के भुयारीकरण पूर्ण
+26 Feb 2021
Metro line 3 completes over 50.30 km of tunneling work
+26 Feb 2021
Previous Pause Next
MMRC

About MMRC

  • Tenders
  • Project
  • News
  • Contact Us
  • eTender
MMRC

Helpful Information

  • Project Route
MMRC

Policy

  • MMRC Green Policy
  • Disclaimer
  • Privacy Policy
MMRC

Other Govt Sites

  • Govt of India
  • MoHUA
  • Indian Railways
  • Govt of Maharashtra
  • MMRDA
  • Other Metros
MMRC
  • mmrc
  • mmrc
  • mmrc
MMRC

MMRC © 2019. All rights are reserved.

  • mmrc
  • mmrc
  • mmrc
Top