imageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimage
imageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimage
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc

Agripada Map No. 20A

Bimonthly Newsletter December 2016

Package - 3

Sr. NoNature of WorkStatus
1Tunneling & Segment Production Progress

Science Museum-Worli ( Tanasa-1) - 1382/1382 rings has been erected Completed

2nd TBM Science Museum-Worli ( Tanasa-2) - 1364/1370  rings has been erected.

Segment Production Progress:

Package - 7

Sr. NoNature of WorkStatus
1Tunneling & Segment Production Progress 

Wainganga-1

Drive-1 (From Pali ground to CSIA-T2) (UpLine) -

Completed 1262rmt, Made Breakthrough on 24/09/2018.

Drive-2 (From Pali Ground to SEEPZ) (UpLine)-

Completed1689rmt, Made Breakthrough on 27/09/2019.

Package - 1

Sr. NoNature of WorkStatus
1Tunneling Progress & Segment Production Progress

Ring Building

TBM 1: Total completed: 1,980.8 Scope: 2,932 (2 Breakthrough Over)

TBM 2: Total completed: 2,068.2 Scope: 2962 (2 Breakthrough Over)

NATM Tunnels (Heading)

Package - 6

Sr. NoNature of WorkStatus
1Tunneling & Segment Production Progress 

CSIA T2 Metro Station

Tunnel CSIA T2 to Sahar Road Station (Downline):

Permanat Ring: Total Progress - 491, Scope - 491

Completed

Package - 5

 Sr. NoNature of WorkStatus
1Tunneling & Segment Production Progress

TBM Drive - VDN to SC-Godavari 01(T61)-Upline

 Permanent Rings: Scope - 2074 Completed

Sacrificial Rings - Scope - 9 Completed

TBM Drive - VDN to SC-Godavari 02(T60)-Downline

Package - 2

 Sr. NoNature of WorkStatus
1Tunneling & Segment Production Progress

TBM - 1 Tunneling completed (TBM dismantalling in progress)

Temporary ring: Scope - 12 Completed