imageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimage
imageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimage
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc

Package - 7

Sr. No Nature of Work Status
1 Tunneling & Segment Production Progress 

Wainganga-1

Drive-1 (From Pali ground to CSIA-T2) (UpLine) -

Completed 1262rmt, Made Breakthrough on 24/09/2018.

Drive-2 (From Pali Ground to SEEPZ) (UpLine) -

689rmt completed out of 1689rmt.

Made Breakthrough at MIDC station on 14/03/2019

Package - 1

Sr. No Nature of Work Status
1 Tunneling Progress & Segment Production Progress

Ring Building

TBM 1: Total completed: 1,228, Scope: 2,932

TBM 2: Total completed: 1,244 Scope: 2962

NATM Tunnels(rmtr)

Upline: Total completed: 88.15m Scope: 215.97m

Downline: Total completed: 86.35m Scope: 217.07m

Segment Production Progress: 100% Completed (4,166 nos)

Package - 6

Sr. No Nature of Work Status
1 Tunneling & Segment Production Progress 

CSIA T2 Metro Station

Tunnel CSIA T2 to Sahar Road Station (Downline):

Package - 5

Sr. No Nature of Work Status
1 Tunneling & Segment Production Progress

TBM Drive - VDN to SC-Godavari 01(T61)-Upline

 Permanent Rings: Scope - 2074, Total progress - 1966

Sacrificial Rings - Scope - 9, Total Progress - 9

Package - 2

 Sr. No Nature of Work Status
1 Tunneling & Segment Production Progress

TBM - 1

Temporary ring: Total progress - 12, Scope - 12

CST - SKD: Total progress - 476, Scope - 476

Bimonthly News Letter October 2016

Song composed by Mumbai Underground, a voluntary support group of Metro-3

Video on Metro-3 made by graduating students of American School

 

Bimonthly News Letter July 2016

Senior Deputy General Manager (Environment)

Twitter

Top