Skip to main content
  • Accessibility And Screen Reader Options
  • English
  • मराठी
  • हिन्दी

A A A

Homepage Logo Mumbai Metro Rail Corporation Ltd. (JV of Govt. of India and Govt. of Maharashtra)

mmrc

Search form
Home MMRC
  • Home
  • About MMRC
    • Know Your Metro
    • Our Vision, Mission & Values
    • Board of Directors
    • Key Management Team
    • Our Organization
    • Managing Director
    • Reports & Documents
    • MOA & AOA
    • Annual Report
  • Project
    • Project Route
    • Project Timeline
    • Project Funding
    • Illustrative Designs
    • Technology
    • Typical Utility Shifting Plan
    • Project Consultants
    • Benefits of Metro Line 3
    • Environmental Benefits
    • Rehabilitation & Resettlement (R&R)
      • FLGRC/SLGRC
      • Public Consultation
      • Final BSES
      • Lottery Result
      • Policy / Project Documents
      • In - situ R&R Office Address
      • BSES Survey Maps
      • Building wise Allotment List
      • Rehabilitation Building Occupation Certificate
    • Projects Reports & Documents
    • NOC
    • Notice
    • Typical Traffic Diversion Plan
  • People Connect
    • FAQ
      • FAQ on Kalbadevi & Girgaon
      • FAQ on Aarey
    • Facts Of Aarey
    • Quick Facts
  • Tenders
    • Civil
    • System
      • Electrical
      • Signalling & Telecom
      • Rolling Stock
      • IT
      • Depot (M&P)
    • Planning
    • Miscellaneous
    • Awarded Contracts
    • MMRC Contractors
    • eTender
    • EOI-MoHUA
  • Media
    • Gallery
      • Photo Gallery
      • Video Gallery
    • News
    • Newsletters
    • MD Speaks
    • Press Releases
    • Social Media
      • Facebook
      • Instagram
      • Twitter
      • Youtube
  • Careers
    • Recruitment
    • Internship Policy
  • RTI/Vigilance
    • RTI (GOI)
    • RTI (GOM)
    • RTI ACT 2005
    • RTI/SANAD
    • PIO/APIO
    • Vigilance
  • Contact Us
    • How to reach us
    • Compliance Officer & Company Secretary
  • Policies
Flash News
  • The MMRCL cautions one and all of Fake appointment letters for Metro-3 corridor The MMRCL cautions one and all of Fake appointment letters for Metro-3 corridor
  • MMRC Control room numbers :- 9136805065 / 7506706477 Pre-Bid Meeting of supply, delivery, plantation and maintenance of advance sized nursery grown trees in Mumbai, Pacakge-20
  1. Home
  2. Package
  3. Weekly progress report for all
mmrc icon

Weekly progress report for all

MMRC

Updated as on: 23rd Aug 2017

Sr. No.Package NamePackage status
1

Procurement of Rolling Stock

  • i) Package 17
  • Bid for Pre-Qualification of applicants - opened on 20th June 2017
  • Evaluation is under process
2

Procurement of Depot Machine & Plant

  • ii) Package 9
  • Tender documents under preparation.

Updated as on: 15th Sep 2021

Sr. No.Nature of WorkStatus
1Tunneling & Segment Production Progress

Science Museum- Worli (Tansa-1) – 1382/ 1382 rings has been erected. (100 % completed)

Science Museum- Worli (Tansa-2) – 1372 / 1372 rings has been erected. (100 % completed)

Science Museum-Mumbai Central (Tansa-1) – 754/ 1308 rings has been erected. (57.64% Completed)

Science Museum-Mumbai Central (Tansa-2) – 745/ 1303 rings has been erected. (57.17% Completed)

2Excavation

Mumbai Central:

2,14,164 / 2,14,164  cu.m ( 100% ) has been completed.

Mahalaxmi:

1,66,229 / 1,66,229 cu.m ( 100%) has been completed.

Science Museum :

2,11,816 / 2,11,816 cu.m ( 100 %) has been completed.

Acharya Atre Chowk:

1,80,973 / 1,88,973  cu.m ( 95.76 % ) has been completed.

Worli:

1,77,370 / 1,77,370 cu.m ( 100% ) has been completed.

3Base Slab Progress 

Mumbai Central:

100 % of the total scope has been completed.

Mahalaxmi:

100% of the total scope has been completed.

Science museum:

100 % of the total scope has been completed.

Acharya Atre Chowk:

72.21 % of the total scope has been completed.

Worli:

100 % of the total scope has been completed

Concourse Slab Progress:

Mumbai Central:

100 % of the total scope has been completed.

Mahalaxmi:

100 % of the total scope has been completed.

Science museum:

83 % of the total scope has been completed.

Acharya Atre Chowk:

43 % of the total scope has been completed.

Worli:

86.90 % of the total scope has been completed

Roof Slab Progress:

Mumbai Central:

100 % of the total scope has been completed.

Mahalaxmi:

99 % of the total scope has been completed.

Science museum:

78 % of the total scope has been completed.

Worli:

48.71 % of the total scope has been completed.

Platform Slab:

Mumbai Central:

29.31 % of the total scope has been completed.

Science museum:

54.76 % of the total scope has been completed.

Worli:

12.94 % of the total scope has been completed.

4Secant Piling Progress 

Station Box Area:

Mumbai Central - 100 % completed

Mahalaxmi – 100 % completed

Science Museum – 100 % completed

Acharya Attre Chowk – 100 % completed

Worli – 100 % completed

5Rehabilitation &; Resettlement

Completed

6Building condition SurveyIn Progress.
7Tree Cutting/transplantation

Tree Cutting and transplantation is in progress -

Mumbai Central- 42 / 43 cut and 46 / 56 transplanted

Mahalaxmi- 33 / 33 cut and 117 / 122 transplanted

Science Museum- 56 / 108 cut and 37 / 87 transplanted

Acharya Attre Chowk- 74 / 76 cut and 26 / 31 transplanted

Worli- 77 / 78 cut and 124 / 134 transplanted

8Traffic Diversion

Completed

9Geo-technical investigation

100 % Completed

10Barricading

100 % completed. In progress with the construction works.

Updated as on: 24th Jan 2021

Sr. No.Nature of WorkStatus
1Tunneling & Segment Production Progress 

Wainganga-1

Drive-1 (From Pali ground to CSIA-T2) (UpLine) -

Completed 1262rmt, Made Breakthrough on 24/09/2018.

Drive-2 (From Pali Ground to SEEPZ) (UpLine)-

Completed1689rmt, Made Breakthrough on 27/09/2019.

Wainganga-2:

Drive-1 (From Sariputnagar Ramp to SEEPZ) (DownLine)-

Completed 568rmt, Made breakthrough on 26/12/2018

Drive-2 (From Pali Ground to SEEPZ) (DownLine)-

Completed 1675rmt, Made Breakthrough at MIDC station on 12/12/2019

Wainganga-3:

Drive-1 (From Pali Ground to CSIA-T2) (DownLine)-

Completed 1313rmt, Made breakthrough on 13/02/2019

Drive-2 (From Sariputnagar Ramp to SEEPZ) (UpLine)-

Completed 572rmt, Made breakthrough on 13/08/2019

Segment Production PRogress:

100% of total completed.

2Excavation 

Station Box area:

Marol Naka: 100% completed

MIDC: 100% completed

SEEPZ: 100% completed

Ramp: 100% completed (including Cut & Cover and shaft area) 

3Base Slab Progress 

Marol Naka: 100%  Completed 

MIDC: 100% Completed

SEEPZ: 100% Completed

 Concourse Slab

Marol Naka: 100% Completed

MIDC: 100% Completed

SEEPZ: 100% Completed

Roof Slab

Marol Naka: 100% Completed

MIDC: 100% completed

SEEPZ: 100% completed

Mezzanine slab

Marol Naka: 100% Completed

4Secant Piling Progress 

Marol Naka: 100% completed

MIDC: 100% completed

SEEPZ: 100% completed

Ramp: 100% completed (including Cut & Cover and shaft area)

5Rehabilitation & Resettlement 

_______

6Building condition Survey

Completed.

7Tree Cutting/transplantation

Marol: Tree Cutting: 7/9, Tree Transplantation: 42/50

MIDC: Tree Cutting: 9/11, Tree Transplantation: 90/130

SEEPZ: Tree Cutting: 9/12, Tree Transplantation: 84/115

 

8Traffic Diversion

Marol Naka: 100% Completed

MIDC: 100% Completed.

SEEPZ: 100% Completed.

9Geo-technical investigation

100% Completed

10Barricading

All the acquired area 100% barricaded.

Updated as on: 19th Sep 2021

Sr. No.Nature of WorkStatus
1Tunneling Progress & Segment Production Progress

TBM Ring Building (rmtr):

TBM 1: Total completed: 2,926.5 Scope: 2,926.5 (4 Breakthrough Over)

TBM 2: Total completed: 2,939.3 Scope: 2,939.3 (4 Breakthrough Over)

NATM

NATM 1:Total completed: 199.12 Scope: 199.12 (Started on 03/04/21 at SCP NATM 1 Upline)

NATM 2:Total completed: 199.12 Scope: 199.12 (Started on 30/04/21 at SCP NATM 2 Downline)

First Stage Concrete:  

TBM1: Total completed:2,100 Scope: 2,926.5(Started on 06/01/21 in SCP to SVB Upline, Started on 05/02/21 in SVB to SCG Upline, Started on 19/08/21 in SCG to SHC Upline)

TBM2:Total completed: 1,910 Scope: 2939.3 (Started on 02/12/20 at SVB to SCG Downline; Started on 27/03/21 in SCP to SVB Downline,  Started on 30/07/21 in SCG to SHC Downline)

NATM Tunnel (Heading)

Upline: Total Completed: 199.12m Scope: 199.12m
Downline: Total Completed: 200.20m Scope: 200.20m
SHC NATM PF: Total Completed: 208.60.60m Scope: 256.27m

NATM Tunnel (Benching)

Upline: Total Completed: 199.12m Scope: 199.12m
Downline: Total Completed: 200.20m Scope: 200.20m
SHC NATM PF: Total Completed: 98m Scope: 256.27m

NATM Tunnel (Secondary Lining)

Upline Invert: 199.12m completed out of 199.12m
Upline Overt: 196.36m completed out of 196.36m
Downline Invert: 200.0m completed out of 200.20m
Downline Overt: 197.85m completed out of 200.20m

Segment Production Progress: 100% Completed (4,166 nos)

2Excavation (Station Box + Entry Corridors along with Column Drop, Sump, Haunch, Earthmat and Berm Deductions)

Cuffe Parade Station: 2,87,887 cum. out of 2,89,615 cum.

Vidhan Bhavan Station: 2,06,929 cum. out of 2,15,664 cum.

Churchgate Station: 2,02,220 cum. out of 2,10,860 cum.

Hutatma Chowk Station: 1,61,024 cum. out of 1,82,394 cum.

Mid Shaft: 13,724 cum. out of 13,724 cum.

3Base Slab Progress

Permanent Base Slab :

9,875 sqmtr completed out  of 9,875 sqmtr at Cuffe Parade

5,775 sqmtr completed out of 5,775 sqmtr at Vidhan Bhavan

6,321 sqmtr  completed out of 6,321 sqmtr at Church Gate

4,641 sqmtr  completed out of 4,641 sqmtr at Hutatma Chowk

Concourse Slab :

8,927 sqmtr completed out of 9,234 sqmtr at Cuffe Parade

5,217 sqmtr completed out of 5,318 sqmtr at Vidhan Bhavan (100% Completed, Only Temporary Openings Left)

5,789 sqmtr completed out of 5,915 sqmtr at Churchgate

3,961sqmtr completed out of 4,251 sqmtr at Hutatma Chowk

Mezzanine/ Other Slab :

8,984 sqmtr completed out of 10,581 sqmtr at Cuffe Parade (Car Park Slab above concourse)

5,193 sqmtr completed out of 5,318 sqmtr at Vidhan Bhavan (100% Completed, Only Temporary Openings Left)

3,960 sqmtr completed out of 4,251 sqmtr at Hutatma Chowk

Roof Slab :

8,562 sqmtr completed out of 9234 sqmtr at Cuffe Parade

3,555 sqmtr completed out of 3752 sqmtr at Vidhan Bhavan (100% Completed, Only Temporary Openings Left)

5,741 sqmtr completed out of 5915 sqmtr at Churchgate

4,049 sqmtr completed out of 4251 sqmtr at Hutatma Chowk

Platform Slab:

2,208 sqmtr completed out of 3430 sqmtr at Cuffe Parade

2,562 sqmtr completed out of 2,634 sqmtr at Vidhan Bhavan

1,955 sqmtr completed out of 3,250 sqmtr at Church Gate

4Secant PilingProgress

Cuffe Parade Station -  Total completed -1,371; Scope –1,371(Only Station Box); Entry Exit: 317 out of 373 completed; Vent Shaft: 26 out of 26 completed.

Vidhan Bhavan Station - Total completed -1,858; Scope – 1,898 (Station Box Piling completed);
Ancillary Building – Total Completed – 77; Scope – 77

Church Gate Station - Total completed -1,406; Scope – 1,406
 Ancillary Building – Total Completed –185; Scope – 185

Hutatma Chowk Station - Total completed – 1,796; Scope – 1,796

Mid Shaft - Total completed – 172; Scope – 172 (Secant Piles)

 Total completed – 50; Scope – 50 (ISMB Soldier Piles)

5Rehabilitation & Resettlement

Vidhan Bhavan Station: Alternate eatery (Kutumbsakhi) has been occupied at new location.

Hutatma Chowk: Container placed at alternate location for Police Chowky. Electricity & water connection and signing of MoU awaited for shifting.

6Building condition Survey100% completed
7Tree Cutting/transplantation

Cuffe Parade Station - 

Scope (To be transplanted/To be cut) - 110/165

Completed (Transplanted/Cut) - 102/156

Vidhan Bhavan Station - 

Scope (To be transplanted/To be cut) - 89/102

Completed (Tsransplanted/Cut) - 60/79

Church Gate Station - 

Scope (To be transplanted/To be cut) - 51/52

Completed (Transplanted/Cut) - 30/35

Hutatma Chowk Station - 

Scope (To be transplanted/To be cut) - 45/76

Completed (Transplanted/Cut) - 43/44 

(All cutting/ transplantation completed as 34 are being saved)

8Traffic Diversion

Phase-1 Traffic Diversions implemented at all station locations

Cuffe Parade- Deck at service lane open to traffic

Vidhan Bhavan- Both decks at Free Press Journal Road open to traffic

Churchgate- Straight Deck and cross deck open to traffic.

Hutatma Chowk- Straight Deck open to traffic

Mid Shaft- Approval Awaited

9Geo-technical investigation

Completed for all stations and alignment

10Barricading

Handed over areas barricaded.

 

Updated as on: 23rd Nov 2020

Sr. No.Nature of WorkStatus
1Tunneling & Segment Production Progress 

CSIA T2 Metro Station

Tunnel CSIA T2 to Sahar Road Station (Downline):

Permanat Ring: Total Progress - 491, Scope - 491

Completed

Permanat Ring: Total Progress - 491, Scope - 491

Completed

Tunnel MVS to CSIA T1 (Upline):

Permanat Ring: Total Progress - 910, Scope - 910

Completed

Tunnel MVS to CSIA T1 (Downline):

Permanat Ring: Total Progress - 890, Scope - 892

Completed

Sahar Road Station to CSMIA
Domestic Airport Station (Downline)

Permanat Ring: Total Progress - 320, Scope - 1080

Segment Production Progress:

Permanent Rings: Total progress - 4949, Scope - 4949

2Excavation 

CSIA T1 Metro station

 Total progress - 266575 Cum. Scope - 270181 Cum. (Work in progress)

Sahar road Station

Total progress - 308629 Cum. Scope - 318141 Cum. (Work in progress)

CSIA T2 Metro Station

Total progress - 451064 Cum. Scope - 468654 Cum. (Work in progress)

3Base Slab Progress 

CSIA T1 Metro station:

Base slab completed.

Concourse Slab:  Total progress - 181 m. Scope - 198 m. (Work in progress)

Concourse to Roof Slab:  Total progress - 265 m. Scope - 390 m. (Work in progress)

Roof Slab:  Total progress - 181 m. Scope - 198 m. (Work in progress)

CSIA T2 Metro Station: 

Base Slab: Total progress - 292.8 m. Scope - 312 m. (Work in progress)

Concourse Slab:  Total progress - 272 m. Scope - 312 m. (Work in progress)

Concourse to Roof Wall:  Total progress - 340.70 m. Scope - 541 m. (Work in progress)

Roof Slab:  Total progress - 182.70 Cum. Scope - 312 m. (Work in progress)

Sahar Road Metro station: 

Base Slab: Completed

Concourse Slab:  Total progress - 180 m. Scope - 220 m. (Work in progress)

Concourse to Roof Slab:  Total progress - 224.50 m. Scope - 328  m. (Work in progress)

Roof Slab:  Total progress - 138 Cum. Scope - 220 m. (Work in progress)

4Secant Piling Progress 

CSIA T1 Metro station

Secant piles: Total progress - 808, Scope - 808

Micro piles: Total progress - 154, Scope - 154

Sahar road Station

Secant piles: Total progress - 1121, Scope - 1121

Subway secant piles: Total progress - 67, Scope - 67

CSIA T2 Metro Station

Secant piles: Total progress - 1298, Scope - 1298

5Rehabilitation & Resettlement 

______

6Building condition Survey

Pre-condition survey this week - 1

Total Progress - 60

Scope - 60

7Tree Cutting/transplantation

CSIA T1 -  Total progress - 3 , Scope - 3 ,  Completed

Transplantation - 59 out of 112

Sahar Rorad - Total progress - 4 , Scope - 4 , Completed

Transplantation - 177 out of 226

CSIA T2 - Total progress - 0 , Scope - 0 , Completed

Transplantation -  4 out of 4 completed

8Traffic Diversion

SAHAR ROAD STATION:

Road diversion: Stage-1 Completed

Subway completed

Sahar Shadow Road:

Commissioned on 27th July 2018.

Caping beam & Flood Wall: Completed

CSIA T2 Metro Station:

Internal Road: Completed.

Ancillary Works for TBM Launching: Completed

9Geo-technical investigation

SAHAR Road Metro station

Completed

Sahar Road to International Station

BHT-26,27 near hutment
area ,Not posiible.

CSIA T1 Metro Station

Completed

CSIA T2 Metro Station

Completed

10Barricading

SAHAR Road Metro station

All construction Works is going on within
secured barricading area .

CSIA T1 Metro station

Completed

CSIA T2 Metro station

Completed

Construction Depot JVLR (GI Sheets)

Completed

Updated as on: 13th Sep 2020

Sr. No.Nature of WorkStatus
1Tunneling & Segment Production Progress

TBM Drive - VDN to SC-Godavari 01(T61)-Upline

 Permanent Rings: Scope - 2074 Completed

Sacrificial Rings - Scope - 9 Completed

TBM Drive - VDN to SC-Godavari 02(T60)-Downline

Permanent Rings: Scope - 2050, Total progress - 2050 Completed

Sacrificial Rings - Scope - 9 Completed

TBM Drive – BKC to VDN(S63)-Down Line

Permanent Rings: Scope - 634 Completed

Sacrificial Rings - Scope - 8 Completed

TBM Drive – BKC to VDN(S64)-Up Line

Permanent Rings: Scope - 635 Completed

Sacrificial Rings - Scope - 8 Completed

TBM Drive – BKC to SDH(S63)-Down Line

Permanent Rings: Scope - 1074, Total progress - 1074 Completed

Sacrificial Rings - Scope - 8 Completed

TBM Drive – BKC to SDH(S63)-UpLine

Permanent Rings: Scope - 1060, Total progress - 1060 Completed

Sacrificial Rings - Scope - 8 Completed

Segment Production Progress:

Mahulgaon Casting Yard

Permenant Rings - Scope - 5262, Total Progress - 2276

Sacrificial Rings - Scope - 435, Total Progress - 169

2Excavation 

Station box(BKC): Scope - 377624, Total progress - 3,65,227

Station Box(Santacruz): Scope - 106000, Total progress - 1,04,500

Station Box(Vidyanagri): Scope - 118062, Total progress - 1,53,838

Station Box(Dharavi): Scope - 179000, Total Progress - 1,76,250

3Base Slab Progress 

Permanent Works: BKC

Base Slab: Scope - 474 M, Total Progress - 315 M

Concourse Slab: Scope - 474 M, Total Progress - 204 M

Roof Slab: Scope - 474 M, Total progress - 192 M

Platform Slab: Scope - 674 M, Total progress - 41 M

Permanent Works: Vidyanagri

Base Slab: Scope - 250 M, Total Progress - 208 M

Concourse Slab: Scope - 250 M, Total Progress - 191 M

Roof Slab: Scope - 250 M, Total progress - 139 M

Platform Slab: Scope - 250 M, Total progress - 68 M

Permanent Works: Dharavi 

Base Slab: Scope - 250 M, Total Progress - 217 M

Concourse Slab: Scope - 250 M, Total Progress - 124 M

Roof Slab: Scope - 250 M, Total progress - 68 M

Platform Slab: Scope - 250 M, Total progress - 0 

Permanent Works: Santacruz

Base Slab: Scope - 252 M, Total Progress - 183 M

Concourse Slab: Scope - 252 M, Total Progress - 84 M

Roof Slab: Scope - 252 M, Total progress - 30 M

Platform Slab: Scope - 252 M, Total progress - 0

4Secant Piling Progress 

Dharavi

North retrieval & Ancillary: Scope - 307 Completed

Station Box: Scope - 779 Completed

Decking Piles-King Post (Interconnection): Scope - 52 Completed

BKC

North launching shaft: Scope - 180 Completed

Station Box: Scope - 1155 Completed

South Launching: Scope - 185 Completed

Decking Piles: Scope - 6 Completed

Entry/Exit-15-19-East(E10): Scope - 76 Completed

Entry/Exit-15-19-East(E11): Scope - 121 Completed

Entry/Exit-15-19-East(E05): Scope - 292, Total Progress - 186

Entry/Exit-15-19-East(E02): Scope - 176, Total Progress - 104

Vidyanagari

North launching shaft: Scope - 176 Completed

Station Box: Scope - 894 Completed

Santacruz

Secant pile: Scope - 585 Completed

Micro pile(station box): Scope - 2182 Completed

Secant pile-(ent/ext)-South: Scope - 163, Total Progress - 119

Secant pile-(ent/ext)-North: Scope - 112, Total Progress - 112

Micro pile(ent/exit): Scope - 468, Total progress - 194

Secant Pile(Ent/Ext)-North West: Scope - 464 , Total Progress - 220

Secant Pile(Ent/Ext)-South West: Scope - 252, Total Progress - 74

Secant Pile (Ent/Ext) East: Scope - 291, Total Progress - 62

MVS

Secant Pile: Scope - 184 Completed

5Rehabilitation & Resettlement 

__________

6Building condition Survey

__________

7Tree Cutting/transplantation

Dharavi

Tree Cutting - Scope - 5, Total Progress - 5, Remarks - Completed

Tree Transplant - Scope - 43, Total Progress - 31, Remarks - Ongoing

BKC

Tree Cutting - Scope - 67, Total Progress - 53, Remarks - Ongoing

Tree Transplant - Scope - 40, Total Progress - 24, Remarks - Ongoing

Vidyanagari

Tree Cutting - Scope - 47, Total Progress - 42, Remarks - Ongoing

Tree Transplant - Scope - 69, Total Progress - 54, Remarks - Ongoing

Santacruz

Tree Cutting - Scope - 7, Total Progress - 7, Remarks - Completed

Tree Transplant - Scope - 23, Total Progress - 21, Remarks - Ongoing

8

Traffic Diversion 

BKC Station – 220 m completed out of 220 m.

Vidyanagri Station – 70 m completed out of 710 m.

 

9
Geo-technical investigation

Vidyanagari Station - Completed

BKC Station - Completed

Santacruz Station - Completed

Dharavi Station - Completed

10Barricading

Vidyanagari Station - This Week - 0 ,Total progress - 382 ,Scope - 446

BKC Station - This Week - 0 ,Total progress - 357 ,Scope - 767

Santacruz Station - This Week - 0 ,Total progress - 517 ,Scope - 600 

Dharavi Station - This Week - 0 ,Total progress - 235 ,Scope - 339

Casting Yard - This Week - 0 ,Total progress - 153 ,Scope - 432

Updated as on: 02nd Nov 2020

Sr. No.Nature of WorkStatus
1Tunneling & Segment Production Progress 

TBM-1 Drive 1 - Nayanagar to Dadar (upline):​

TBM Lowered on 21.09.17

Initial Drive Start on 06.11.17

Initial Drive Completed on 24.01.18

Main Drive started on 26.02.18

Rings Erected – 1779 / 1779 Nos (100% completed)

Break Through on 31.01.2019

TBM-2 Drive 1 - Nayanagar to Dadar (downline) :

TBM Lowered on 18.10.17

Initial Drive Start on 03.12.17

Initial Drive Completed on 19.02.18

Main Drive started on 24.03.18

Rings Erected – 1766 / 1766 Nos (100% completed)

Break Through on 31.01.2019

TBM-3 Drive 1 - Siddhivinayak to Worli (upline) :

TBM Lowered on 19.06.18

Initial Drive Start on 14.07.18

Initial Drive Completed on 03.09.18

Main Drive Start on 10.10.18

Rings Erected – 931/ 931 Nos (100% completed)

Break Through on 15.03.2019

TBM-3 Drive 2 - Siddhivinayak to Worli (downline):

TBM Lowered on 27.04.19

Initial Drive Start on 16.05.19

Initial Drive Completed on 27.06.19

Main Drive Start on 20.07.2019

Rings Erected – 917 / 917 Nos (100% completed)

Break Through completed on 16.03.2020

TBM-2 Drive 2 - Naya Nagar to Dharavi (downline):

TBM Lowered on 07.05.19

Initial Drive Start on 27.05.19

Initial Drive Completed on 27.06.19

Main Drive Start on 22.07.2019

Rings Erected – 421 / 421 Nos (100% completed)

Break Through completed on 12.10.2019

TBM-1 Drive 2 - Naya Nagar to Dharavi (upline):

TBM Lowered on 17.06.19

Initial Drive Start on 28.07.19

Initial Drive Completed on 09.08.19

Main Drive Start on 21.09.2019

Rings Erected – 421 / 421 Nos  (100% completed)

Break Through completed on 21.11.2019

TBM-2 - Drive 3 - Siddhivinayak to Dadar (upline):

TBM Lowered on 25.10.19

Initial Drive Start on 16.12.19

Initial Drive Completed on 19.01.20

Main Drive Start on 10.02.20

Rings Erected – 791 / 791 Nos  (100% completed)

Break Through completed on 05.10.2020

TBM-1 - Drive 3 - Siddhivinayak to Dadar (Downline):

TBM Lowered on 10.01.20

Initial Drive Start on 10.02.20

Initial Drive Completed on 09.03.20

Main Drive Start on 07.07.20

Rings Erected – 531 / 804 Nos  (66% completed)

Segment Production Progress

Temporary Segments casted – 102 Nos /180 Nos

Sacrificial Segments casted – 510 Nos/ 2100 Nos

Permanent Segments casted – 46577 Nos / 46577 Nos (100% completed)

2Excavation 

Siddhivinayak Station 

Excavation - 2,34,804 Cum / 2,34,804 Cum (100% scope completed)

Dadar Station

Excavation - 171759 Cum /17179 Cum (100% scope completed)

Sitladevi Station

Excavation - 143876 Cum /158000 Cum (91% scope completed)   

3Base Slab Progress 

 Siddhivinayak Station 

Base Slab 210 Rm / 250 Rm (84% completed)

Concourse Slab 209 Rm / 250 Rm (84% completed)

Intermediate Slab 182 Rm / 250 Rm (73% completed)

Roof Slab 154 Rm / 250 Rm (62% completed)

Platform Slab 162 Rm / 250 Rm (65% completed)

Dadar Station

Base Slab 198.2 Rm/ 324 Rm (61% completed)

Concourse Slab 82.3 Rm/ 324 Rm (25% completed)

Sitladevi Station

Base Slab 49.5 Rm/ 244 Rm (20% completed) 

Mezzanine Slab – 21 Rm / 244 Rm (9% completed)

4Secant PilingProgress

Siddhivinayak Station 

Pilling works 96% scope completed (1474 Nos /1533 Nos)

Dadar Station 

Pilling works 1083 Nos / 1083 Nos Piles completed (100% completed)

King Post – 29 / 29 Nos (100% completed)

Decking works – 8467 / 8467 Sqm (100% completed)

Sitladevi Station

Pilling works - 1026 Nos / 1026 Nos Piles (100% completed)

King Post – 21/21 Nos (100% completed)

Decking works – 6965 / 6965 Sqm (100% Completed)

5Rehabilitation & Resettlement 

R&R Process at Nayanagar Launching Shaft Area - Completed  

6Building condition Survey

96% Project scope completed (612 out of 647 completed)

Report distribution in progress – 580 / 647 completed

7Tree Cutting/transplantation

Tree Plantation – 315 compensatory trees planted

Neighborhood tree saplings distribution – 3054 Nos 

Tree Cutting –85% scope completed (133 Nos / 157 Nos)

Tree Transplantation – 95% ( 96 Nos / 101 Nos) 

8Traffic Diversion

Road Diverted at Dadar on 30th July 2017

Road Diverted at Sitladevi on 5th August 2017

9Geo-technical investigation

 100% Project scope completed (59 out of 59 bores completed)

10Barricading

Project scope completed

 

Updated as on: 09th Feb 2020

 Sr. No.Nature of WorkStatus
1Tunneling & Segment Production Progress

TBM - 1 Tunneling completed (TBM dismantalling in progress)

Temporary ring: Scope - 12 Completed

CST - SKD: Scope - 476 Completed

SKD - SGG: Scope - 499  Completed

SGG - SGR: Scope - 1,110 Completed

SGR - SMC: Scope - 635 Completed

TBM - 2

Temporary ring: Scope - 12 Completed

CST - SKD: Scope - 482 Completed

SKD - SGG: Scope - 488  Completed

SGG - SGR: Scope - 1,123 Completed

SGR - SMC: Total progress - 422, Scope - 639

Note:

TBM 2 stopped due to Parsi Fire Temple Issue on 20.07.2018 and resumed on 30.11.18

Second time stopped on 6.12.18 & resumed on 10.12.18

The productivity of TBM 2 is low due to unanticipated ground condition

Segment Production

Permanent Rings (including Upline & Downline)

SCS - SKD: Scope - 961 Completed

SKD - SGG: Scope - 713 Completed

SGG - SGR: Scope - 1,913 Completed

SGR - SMC: Scope - 991 Completed

Temporary Rings (including Upline & Downline)

SCS: Scope - 20 Completed

SKD: Scope - 277 Completed

SGG: Scope - 313 Completed

SGR: Scope - 287 Completed

2Excavation 

CST Station

Launching shaft: Scope - 25,859 Cum. Completed

Station Box (with extended concourse) - Scope - 1,26,691 Cum. Completed

Entry and Exit- Total Progress - 11,310 Cum. Scope - 29,956  Cum.

Grant Road

Station Box- Total Progress - 59,938 Cum. Scope - 1,03,536 Cum.

EE-1(Phase-02) - Total Progress - 8,829, Scope - 9,329

EE-2(Phase-05) - Total Progress - 2,364, Scope - 2,959

EE-3 (Phase-08) - Scope - 2,686

Girgaon

EE-2 (Swami Niwas) - Scope - 2,010

Station Box EE-3 (Extended conc.) -  Total Progress - 24,036, Scope - 1,39,980

Kalbadevi

Station Box- Total Progress

K-1 Box - Total Progress - 2,307, Scope - 26,621

K-2 Box -  Total Progress - 11,798, Scope - 52,000

3Base Slab Progress

CST

Station Box: Total Progress - 180, Scope - 250 

4Secant Piling Progress 

CST Station

Primary pile - Station Box: Scope - 359 Completed

Secondary pile Station Box: Scope - 352 Completed

Primary pile - Entry & Exit: Total progress - 620, Scope - 662

Secondary pile - Entry & Exit: Total progress - 628, Scope - 661

Grant Road Station

Primary pile: Total progress - 370, Scope - 371

Secondary pile: Scope - 373 Completed

Primary pile - Entry & Exit: Total progress - 53, Scope - 56

Secondary pile - Entry & Exit: Total progress - 48, Scope - 56

Girgaon Station

Primary pile Station Box: Scope - 353 Completed

Secondary pile Station Box: Total progress - 340, Scope - 345

Primary pile - Entry & Exit: Scope - 88 Completed

Secondary pile - Entry & Exit: Scope - 88 Completed

Kalbadevi Station K-2 Box

Primary Pile Station Box: Scope - 167 Completed

Secondary Pile Station Box: Scope - 167 Completed

Kalbadevi Station K-1 Box

Primary Pile Station Box: Scope - 96 Completed

Secondary Pile Station Box: Scope - 96 Completed

5Rehabilitation & Resettlement 

Rehabilitation & Resettlement is in progress.

Compensation meeting in progress with project affected residents in Kalbadevi and Girgaon.

6Building condition Survey

Pre - Condition Survey

Total Progress - 884

Scope - 1,004

Note: Additional 25M Topography survey on either of ZOI completed

7Tree Cutting/transplantation

CST - Total Progress - 47 , Scope - 91

CST - Transplantation - Total Progress - 62 , Scope - 97

Grant Road  - Total Progress - 28 , Scope - 28

Grant Road Transplantation - Total Progress - 21 , Scope - 21

Girgaon - Total Progress - 10 , Scope - 11

Girgaon Transplantation - Total Progress - 9 , Scope - 9

New Plantation at Aarey Colony  - Total Progress - 205 , Scope - 35

8 Traffic Diversion 

Permission for Traffic Diversion at Girgaon station received and  trial run road diversion started from 18th May 2017.

Trail run for traffic diversion at Grant road done on 20th July’2017 and road diversion started from 27th July’2017.

9Geo-technical investigation

Geo-technical investigation for Stations as well as Tunnel completed.

10Barricading

Barricading for CST Station Box, Wadala Casting Yard and WTC completed.

Barricading in Grant Road completed for Garden Side.

Structural Steel barricading for Median done at Grant Road.

Barricading in Girgaon completed for 619 RM out of 619 RM (Approx.)

Barricading in Kalbadevi station started as per land available on 29.09.18

MMRC
Shri. Uddhav Thackeray
Shri. Uddhav Thackeray
Hon'ble Chief Minister 
Maharashtra

"I appreciate when projects move ahead with required urgency, to achieve desirable results. The 33.5-km Metro-3 corridor (Colaba-Bandra-SEEPZ) is showing promising speed in this direction. Our aim is to complete the project, highly needed to reduce traffic congestion in Mumbai within the schedule time frame. Metros help reduce carbon footprint as well as pollution. It’s the greenest mass rapid transit system.”

Shri. Devendra Fadanvis
Shri. Venkaiah Naidu
Hon. Minister for Urban Development Department 
Government of India.

"The city of Mumbai requires a ‘metro’ to reclaim its lost glory and I, on behalf of the Centre, promise all help to the State. Implementing infrastructure projects in a city like Mumbai isn’t an easy job. It requires positive attitude. Of course, I’m sure the people of this never-say-stop city will lend their wholehearted support to the 33.5-km long Colaba-Bandra-SEEPZ Metro-3 underground corridor.”

MMRC

Recent News

mmrc
इस माह के अंत तक आएगी भूमिगत मार्ग की पहली ट्रैन
+04 Mar 2022
आय विटनेस भुयारांमध्ये होणार मेट्रोची चाचणी
+03 Mar 2022
First train for underground Metro 3 corridor to reach city by March-end
+03 Mar 2022
महालक्ष्मी, आचार्य अत्रे चौक, वरळी मेट्रो वेगाने
+25 Feb 2022
गिरगावसह काळबादेवीही सुसाट
+19 Feb 2022
भुयारी मेट्रो ३ प्रगतीपथावर
+16 Feb 2022
Previous Pause Next
MMRC

About MMRC

  • Tenders
  • Project
  • News
  • Contact Us
  • eTender
MMRC

Helpful Information

  • Project Route
MMRC

Policy

  • MMRC Green Policy
  • Disclaimer
  • Privacy Policy
MMRC

Other Govt Sites

  • Govt of India
  • MoHUA
  • Indian Railways
  • Govt of Maharashtra
  • MMRDA
  • Other Metros
MMRC
  • mmrc
  • mmrc
  • mmrc
MMRC

MMRC © 2019. All rights are reserved.

  • mmrc
  • mmrc
  • mmrc
Top