Sr. NoNature of WorkStatus
1Tunneling & Segment Production Progress 

TBM-1 Drive 1 - Nayanagar to Dadar (upline):

TBM Lowered on 21.09.17

Initial Drive Start on 06.11.17

Initial Drive Completed on 24.01.18

Main Drive started on 26.02.18

Rings Erected – 1779 / 1779 Nos (100% completed)

Break Through on 31.01.2019

TBM-2 Drive 1 - Nayanagar to Dadar (downline) :

TBM Lowered on 18.10.17

Initial Drive Start on 03.12.17

Initial Drive Completed on 19.02.18

Main Drive started on 24.03.18

Rings Erected – 1766 / 1766 Nos (100% completed)

Break Through on 31.01.2019

TBM-3 Drive 1 - Siddhivinayak to Worli (upline) :

TBM Lowered on 19.06.18

Initial Drive Start on 14.07.18

Initial Drive Completed on 03.09.18

Main Drive Start on 10.10.18

Rings Erected – 931/ 931 Nos (100% completed)

Break Through on 15.03.2019

TBM-3 Drive 2 - Siddhivinayak to Worli (downline):

TBM Lowered on 27.04.19

Initial Drive Start on 16.05.19

Initial Drive Completed on 27.06.19

Main Drive Start on 20.07.2019

Rings Erected – 917 / 917 Nos (100% completed)

Break Through completed on 16.03.2020

TBM-2 Drive 2 - Naya Nagar to Dharavi (downline):

TBM Lowered on 07.05.19

Initial Drive Start on 27.05.19

Initial Drive Completed on 27.06.19

Main Drive Start on 22.07.2019

Rings Erected – 421 / 421 Nos (100% completed)

Break Through completed on 12.10.2019

TBM-1 Drive 2 - Naya Nagar to Dharavi (upline):

TBM Lowered on 17.06.19

Initial Drive Start on 28.07.19

Initial Drive Completed on 09.08.19

Main Drive Start on 21.09.2019

Rings Erected – 421 / 421 Nos  (100% completed)

Break Through completed on 21.11.2019

TBM-2 - Drive 3 - Siddhivinayak to Dadar (upline):

TBM Lowered on 25.10.19

Initial Drive Start on 16.12.19

Rings Erected – 321 / 794 Nos (40% completed)

TBM-1 - Drive 3 - Siddhivinayak to Dadar (Downline):

TBM Lowered on 10.01.20

Initial Drive Start on 10.02.20

Rings Erected – 112 / 804 Nos (14 % completed)

Segment Production Progress

Temporary Segments casted – 102 Nos /180 Nos

Sacrificial Segments casted – 510 Nos/ 2100 Nos

Permanent Segments casted – 45941 Nos / 46476 Nos (99% completed)

2Excavation 

Siddhivinayak Station 

Excavation - 2,34,804 Cum / 2,34,804 Cum (100% scope completed)

Dadar Station

Excavation - 170058 Cum /170090 Cum (99% scope completed)

Sitladevi Station

Excavation - 124762 Cum /147531 Cum (85% scope completed)   

3Base Slab Progress 

 Siddhivinayak Station 

Base Slab 210 Rm / 250 Rm (84% completed)

Concourse Slab 209 Rm / 250 Rm (84% completed)

Intermediate Slab 182 Rm / 250 Rm (73% completed)

Roof Slab 154 Rm / 250 Rm (62% completed)

Platform Slab 162 Rm / 250 Rm (65% completed)

Dadar Station

Base Slab 142.4 Rm/ 324 Rm (44% completed)

Concourse Slab 82.3 Rm/ 324 Rm (25% completed)

Sitladevi Station

Base Slab 22 Rm/ 244 Rm (9% completed) 

4Secant PilingProgress

Siddhivinayak Station 

Pilling works 98% scope completed (1450 Nos /1485 Nos)

Dadar Station 

Pilling works 1083 Nos / 1083 Nos Piles completed (100% completed)

King Post – 29 / 29 Nos (100% completed)

Decking works – 8467 / 8467 Sqm (100% completed)

Sitladevi Station

Pilling works - 1026 Nos / 1026 Nos Piles (100% completed)

King Post – 21/21 Nos (100% completed)

Decking works – 6965 / 6965 Sqm (100% Completed)

5Rehabilitation & Resettlement 

R&R Process at Nayanagar Launching Shaft Area - Completed  

6Building condition Survey

96% Project scope completed (612 out of 647 completed)

Report distribution in progress – 580 / 647 completed

7Tree Cutting/transplantation

Tree Plantation – 315 compensatory trees planted

Neighborhood tree saplings distribution – 3054 Nos 

Tree Cutting –85% scope completed (133 Nos / 157 Nos)

Tree Transplantation – 95% ( 96 Nos / 101 Nos) 

8Traffic Diversion

Road Diverted at Dadar on 30th July 2017

Road Diverted at Sitladevi on 5th August 2017

9Geo-technical investigation

 100% Project scope completed (59 out of 59 bores completed)

10Barricading

Project scope completed

Memcache statistics

operationtotal mstotal hitstotal misses
get7.1213 (81.3%)3 (18.8%)
set3.752 (100.0%)0 (0.0%)
getMulti0.182 (100.0%)0 (0.0%)
msoperationbinkeystatus
0.35getcache_bootstrapcache_bootstrap-lookup_cachehit
0.11getcache_bootstrapcache_bootstrap-variablesmiss
3.11setcache_bootstrapcache_bootstrap-variableshit
1.69getcache_bootstrapcache_bootstrap-bootstrap_moduleshit
0.12getcache_bootstrapcache_bootstrap-variable%3Alanguage%3Aenhit
1.63getcache_bootstrapcache_bootstrap-system_listhit
0.49getcache_bootstrapcache_bootstrap-module_implementshit
0.59getcachecache-entity_info%3Aenhit
0.09getMulticachecache-.wildcard-entity_info%3Ahit
0.08getcache_pathcache_path-ckeditor%2Fxssmiss
0.12getcache_librariescache_libraries-colorboxhit
0.09getcachecache-mailsystem_get_classeshit
1.29getcachecache-theme_registry%3Ammrchit
0.09getMulticachecache-.wildcard-theme_registryhit
0.09getcache_rulescache_rules-rules_event_whitelisthit
0.10getcachecache-filter_formats%3Aenhit
0.15getcachecache-filter_list_formathit
0.14getcache_bootstrapcache_bootstrap-hook_infohit
0.64setcache_bootstrapcache_bootstrap-module_implementshit
0.08getcache_bootstrapcache_bootstrap-_drupal_file_scan_cachemiss
Top