Tenders Published

Sr. No. Title Type Tender Ref No Date Of Issue Download
11 Design, Manufacture, Supply, Installation, Testing & Commissioning of A) Synchronized Under Floor Lifting System, B) Synchronized Mobile Lifting Jacks and C) Bogie Turn Tables RFP MM3-CBS-DEQ-9-05 05/09/2019 file
12 Part Design, Procurement and Part Supply, Installation, Testing and Commissioning of Ballastless Track on the Mainline from Aarey station (excluded) until BKC station (included) andBallasted Track in the area of at-grade Aarey Station and in the Depot area of Mumbai Metro Line 3 (Colaba – Bandra – SEEPZ) and Procurement and Supply of Turnouts, Scissor Crossovers and Buffer Stops for the entire Mainline for Mumbai Metro Line 3 (Colaba – Bandra – SEEPZ) including Package 10 B Addendum - 3 and Bidders Queries Response MM3-CBS-TWK-03 (Package 10C) 04/09/2019 file
13 Construction of residential cum commercial high-rise building at Kalbadevi CS No. 662 and 1/662 of Bhuleshwar division for rehabilitation of Metro Line-3 Project Affected Persons of Kalbadevi and Girgaon Corrigendum 3 MMRC/Planning/NIT/K3/19/08 26/08/2019 file
14 Supply, Installation, Testing and Commissioning of 12 nos. of Lifts/Elevators (6nos. of 612Kg / 9Person, and 6nos. of 408Kg/6 Person) including 2 years AMC work at Rehabilitation site of Mumbai Metro Rail Corporation Limited at Building No. 10 A to F Wing (2 lifts in each wing) situated in HDIL Premier Compound, Kurla, Mumbai, Pin code:- 400070 Notice MMRC/Planning/NIT/LiftsKurla/19/10 24/08/2019 file
15 Invitation for Bids "Supply of 8490 MT Head Hardened (HH) Rails (UIC 60E1, IRS-T-12:2009, 1080 grade) for Track Work of Mumbai Metro Line 3 (Colaba-Bandra-SEEPZ) Rail Project." Invitation for Bids MM3-CBS-TWK-04 (Package - 10D) 23/08/2019 file
16 Part Design, Procurement and Part Supply, Installation, Testing and Commissioning of Ballastless Track on the Mainline from Aarey station (excluded) until BKC station (included) and Ballasted Track in the area of at-grade Aarey Station and in the Depot area of Mumbai Metro Line 3 (Colaba – Bandra – SEEPZ). and Procurement and Supply of Turnouts, Scissor Crossovers and Buffer Stops for the entire Mainline for Mumbai Metro Line 3 (Colaba – Bandra – SEEPZ) including Package 10 B. Addendum - 2 and Bidders Queries Response MM3-CBS-TWK-03 (PACKAGE 10C) 23/08/2019 file
17 Invitation for Bids "Supply of 2250 MT Rails (UIC 60E1, IRS-T-12:2009, 880 grade) for Track work of Mumbai Metro line 3 (Colaba-Bandra-SEEPZ) Rail Project." Invitation for Bids MM3-CBS-TWK-05 (Package - 10E) 23/08/2019 file
18 Construction of residential cum commercial high-rise building at Kalbadevi CS No. 662 and 1/662 of Bhuleshwar division for rehabilitation of Metro Line-3 Project Affected Persons of Kalbadevi and Girgaon Corrigendum 2 MMRC/Planning/NIT/K3/19/08 20/08/2019 file
19 Design, Manufacture, Supply, Installation, Testing & Commissioning of Rescue Vehicle (Rail-cum-Road Vehicle with Re-Railing & Rescue Equipment) RFP MM3-CBS-DEQ-9-04 20/08/2019 file
20 Design, Manufacture, Supply, Installation, Testing & Commissioning of Rescue Vehicle (Rail-cum-Road Vehicle with Re-Railing & Rescue Equipment) Invitation for Bids MM3-CBS-DEQ-9-04 20/08/2019 file

Stay Informed

1 + 5 =
Top