फोटो गैलरी (Photo Gallery)

    • Ancillary building works - Mahalaxmi
    • Base slab reinforcement works - Worli
    • Aerial view - Mumbai Central
    • Ancillary building base slab reinforcement works - Mahalaxmi
    • Wall and column reinforcement works - Science Museum
    • Concourse slab curing - Science Museum
    • Staion Wall Reinforcement Fixing - Science Museum
    • Base Slab Reinforcement Fixing - Science Museum
    • UGC-02 TBM retrieval - Mumbai Central
    • Excavation - Mahalaxmi
    • Aerial View - Acharya Attre Chowk
    • Base slab reinforcement fixing - Mumbai Central
    • Base slab reinforcement works - Worli
    • Wall construction - Science Museum
    • Aerial view - Mumbai Central
    • Base slab reinforcement works - Worli
    • Excavation - Acharya Attre Chowk
    • Slabs and wall reinforcement works - Science Museum
    • Water proofing works - Base Slab Worli
    • Aerial View - Mahalaxmi
    • Excavation - Mumbai Central
    • Aerial View - Mumbai Central
    • Excavation - Worli
    • Excavation - Ancillary building - Mahalaxmi
    • Excavation - Worli
    • Excavation - Worli
    • Excavation - Worli
    • Laying of 1800 mm sewer line and 900 mm SWD line - Acharya Attre
    • Aerial view - Science Museum
    • Laying of 1800mm dia sewer line & 900mm dia SWD line - Acharya Attre
    • Excavation - Mahalaxmi
    • Excavation - Mumbai Central
    • Base slab and wall construction - Science Museum
    • Excavation - Acharya Attre
    • Base slab and wall construction - Science Museum
    • Base slab and wall construction - Science Museum
    • Excavation - Worli
    • Excavation - Acharya Attre
    • Laying of 1800mm sewer line - Acharya Attre
    • Aerial view - Mumbai Central
    • Base slab and wall construction - Science Museum
    • Excavation - Acharya Attre
    • Excavation - Mahalaxmi
    • Excavation - Mumbai Central
    • Laying of 1800mm sewer line - Acharya Attre
    • Aerial view - Mahalaxmi
    • Excavation - Mahalaxmi
    • Excavation - Worli
    • Laying of 1800 MM dia sewer line
    • Excavation - Acharya Attre
    • Cross decking works - Acharya Attre
    • Excavation - Mumbai Central
    • Excavation - Science Museum
    • Excavation - Worli
    • 1800 mm sewer line diversion - Acharya Attre
    • Aerial view - Mumbai Central
    • Aerial view - Mahalaxmi
    • Excavation - Mahalaxmi
    • Excavation - Science Museum
    • Excavation - Worli
    • Excavation - Worli
    • Excavation - Science Museum
    • Excavation - Science Museum
    • Excavation - Mumbai Central
    • Excavation - Mahalaxmi
    • Excavation - Worli
    • Excavation - Mahalaxmi
    67
    Package - 3 ( Mumbai Central-Mahalaxmi-Science Museum-...
    06/10/2019
    • Cross Passage - 1
    • Marol Naka
    • MIDC
    • Marol Naka
    • MIDC
    • SEEPZ
    • Marol Naka
    • MIDC
    • Marol Naka
    • MIDC
    • Marol Naka
    • MIDC
    • SEEPZ
    • Marol Naka
    • MIDC
    • MIDC
    • Marol Naka
    • Marol Naka
    • Marol Naka - NATM work
    • MIDC
    • NATM - Marol Naka
    • Wainganga - 3 Breakthrough at SEEPZ
    • NATM - Upline
    • Marol Naka
    • MIDC
    • MIDC
    • Marol Naka
    • SEEPZ
    • MIDC
    • MIDC
    • Marol Naka
    • Marol Naka Cross Passage
    • Marol Naka Cross Passage
    • MIDC
    • Work in progress at Marol Naka
    • MIDC
    • Work in progress at SEEPZ
    • Marol Naka
    • Marol Naka
    • SEEPZ
    • MIDC
    • Cross Passasge
    • Marol Naka
    • MIDC
    • SEEPZ
    • Marol Naka
    • MIDC
    • SEEPZ
    • Marol Naka
    • MIDC
    • SEEPZ
    • SEEPZ
    • MIDC Base slab 100% completed
    • MIDC Base slab 100% completed
    • MIDC Base slab 100% completed
    • Marol Naka
    • Marol Naka
    • MIDC
    • Marol Naka
    • Marol Naka
    • Marol Naka
    • MIDC
    • MIDC
    • SEEPZ
    • Marol Naka
    • MIDC
    • MIDC
    • MIDC
    • SEEPZ
    • MIDC
    • MIDC
    • MIDC
    • SEEPZ
    • Marol Naka
    • SEEPZ
    • MIDC
    • Marol Naka
    • Marol Naka
    78
    Package - 7 ( Marol Naka-MIDC-SEEPZ )
    06/10/2019
    • Concourse Slab Reinforcement Progress in Grid 6-8 at Hutatma Chowk Station
    • Excavation Progress in Grid 10-12 and staging work for Concourse Slab
    • MS-RS Wall Progress in Grid 6-9 at Vidhan Bhavan Station
    • Excavation Progress in North Side Station Box at Churchgate Station
    • Base Slab Progress in Grid C2-2 at Cuffe Parade Station
    • Core Cutting for TBM1 Breakthrough at Churchgate Station
    • Concourse Staging and Shuttering Progress in Grid 4-6 at Vidhan Bhavan Station
    • Roof Slab Reinforcement Progress in Grid C9-C7 at Cuffe Parade Station
    • South Head Wall Progress at Churchgate Station
    • Mezzanine Slab curing in Grid 6-8 at Vidhan Bhavan Station
    • Roof Slab curing in Grid 10-11 at Vidhan Bhavan Station
    • MS Walls Progress in Grid 6-9 at Hutatma Chowk Station
    • Concourse Slab Progress in Grid 5-6 at Vidhan Bhavan Station
    • Roof Slab Shuttering Progress in Grid C9-C8 at Cuffe Parade Station
    • Concourse Slab in Grid 17-19 at Vidhan Bhavan Station
    • Mezzanine Slab in Grid 6-9 at Hutatma Chowk Station
    • Concourse Slab Shuttering Progress in Grid 17-19 at Vidhan Bhavan Station
    • Mezzanine Slab Reinforcement Progress in Grid 6-9 at Hutatma Chowk Station
    • Roof Slab Reinforcement Progress in Grid C7-C6 at Cuffe Parade Station
    • Roof Slab Staging Progress in Grid 9-11 at Vidhan Bhavan Station
    • Concourse Slab Shuttering Progress in Grid 17-19 at Vidhan Bhavan Station
    • Staging and Shuttering Progress for Mezzanine Slab in Grid 6-7 at Hutatma Chowk Station
    • CS-MS-Walls progress in Grid-6-8 at - Vidhan Bhavan Station
    • CS Staging in Grid 13-15 at Vidhan Bhavan Station
    • Excavation Progress in Grid 12-16 at Churchgate Station
    • Keeping Site Surroundings free from water-logging in heavy rains in Hutatma Chowk Station
    • Excavation Progress in North Side SB at Churchgate Station
    • Permanent Works Progress till Grid C2 at Cuffe Parade Station
    • TBM2 Progress at Vidhan Bhavan Station
    • Base Slab Completion in Grid 7-9 at Hutatma Chowk Station
    • Mezzanine Slab Shuttering Progress in Grid 11-13 at Vidhan Bhavan Station
    • Permanent Works Progress in South SB at Hutatma Chowk Station
    • Roof Slab Staging Progress in Grid C8-C6 at Cuffe Parade Station
    • TBM 2 Dragging in Progress at Vidhan Bhavan Station
    • BS-MS Wall Progress in Grid 4-6 at Hutatma Chowk Station
    • CS-MS West Side Walls Progress in Grid 6-8 at Vidhan Bhavan Station
    • BS-CS West Side Walls Progress in Grid C2-01 at Cuffe Parade Station
    • Ground Anchor Drilling in progress at Churchgate Station
    • Balance Excavation at South Headwall at Churchgate Station
    • Mezzanine Slab Progress in Grid 8-11 at Vidhan Bhavan Station
    • Permanent Works Progress in Grid C5-C1 at Cuffe Parade Station
    • Base Slab PCC and Column Drop Excavation in Grid 3-5 at Churchgate Station
    • Excavation Progress in Grid 8-10 at Hutatma Chowk Station
    • Mezzanine Slab Staging Progress at Vidhan Bhavan Station
    • North Head Wall Rebar Progress at Vidhan Bhavan Station
    • Ariel View of Vidhan Bhavan Station
    • Excavation Progress in Grid 1-3 at Cuffe Parade Station
    • Base Slab completion at Vidhan Bhavan Station
    • Base Slab Progress at Churchgate Station
    • Base Slab Progress at Hutatma Chowk Station
    • CS-MS Wall Progress in Grid 8-12 at Vidhan Bhavan Station
    • OTE duct Progress in Grid 15-16 at Cuffe Parade Station
    • Permanent Works Progress in SB at Vidhan Bhavan station
    • Senior Management of MMRC and L&T-STEC during breakthrough of SURYA-2
    • SURYA-2 Breakthrough at Vidhan Bhavan
    • Vidhan Bhavan Base Slab nearing completion
    • TBM Receiving Area at Vidhan Bhavan
    • Excavation progress in Grid 10-14 at Cuffe Parade Station
    • PCC progress in on road portion at Vidhan Bhavan Station
    • Wall progress in on road portion at Vidhan Bhavan Station
    • TBM SURYA-1 after breakthrough at Vidhan Bhavan
    • TBM SURYA-1 Breakingthrough at Vidhan Bhavan
    62
    Package - 1 ( Cuffe Parade-Vidhan Bhavan-Churchgate )
    06/10/2019
    • BKC Station South side
    • Vidyanagri Station
    • Dharavi Excavation and Base Slab Work
    • BKC Station
    • Santacruz Station Wall Work
    • Dharavi - Ancillary building excavation
    • Excavation at ITO junction - BKC
    • Vidyanagari North Side
    • BKC
    • Excavation at Dharavi
    • Vidyanagri Station
    • BKC Concourse slab shuttering
    • Vidyanagari - Roof slab reinforcement
    • Dharavi - Excavation
    • Bandra Station - Concourse
    • Dharavhi Station - North Side
    • Vidyanagari Station
    • Dharavi Station - Excavation at North Shaft
    • Santacruz Station - Plant Room
    • Vidyanagari Station - Concourse Slab
    • BKC
    • Bandra Station Excavation site
    • Cross passage - Bandra Station
    • Dharavi Station Excavation sikte
    • Santacruz Station Excavation
    • Vidya Nagari Station - Concourse slab
    • Dharavi Station - Excavation
    • Vidyanagri Station - Wall casting
    • Dharavi Station - Excavation
    • BKC
    • BKC - NATM
    • Dharavi
    • Dharavi
    • Santacruz
    • Vidyanagari
    • BKC
    • Dharavi
    • Dharavi
    • Vidyanagari
    • Vidyanagari Excavation site
    • BKC steel deck work in progress
    • BKC Excavation site.
    • Dharavi Excavation site
    • Santacruz
    • Dharavi
    • BKC
    • Santacruz
    • Santacruz
    • BKC
    • BKC
    • Dharavi
    • Santacruz
    • Santacruz
    • MV - Shaft
    • Dharavi
    • Bandra Station Diversion
    • BKC
    • Bandra Station Excavation
    • Santaceuz Station Excavation
    • Santaceuz Station Excavation
    • Dharavi Station Excavation
    • Vidyanagari Station Excavation below strut
    • BKC ITO Junction Piling
    • BKC Excavation (19-35)
    • Dharavi Phase-2 Decking
    • Santacruz west wall
    • Santacruz east wall
    • Vidyanagari excavation Gr-04-06
    • Vidyanagari Excavations
    • BKC Station Excavations
    • Santacruz Station Excavations
    • Dharavi Station Cable Diversion
    72
    Package - 5 ( Dharavi-BKC-Vidyanagari-Santacruz )
    22/09/2019
    • Grant Road Station
    • Kalbadevi Station
    • CST
    • NATM Works
    • CST
    • NATM works
    • Grant Road Station
    • CST
    • Girgaon
    • Grant Road
    • NATM
    • Station Chatrapati Shivaji
    • Station Chatrapati Shivaji
    • Grant Road Station
    • Station Chatrapati Shivaji - Base slab PCC works
    • Grant Road Station - Chamber top slab concreting under progress
    • Girgaon Station - Kranti Nagar Building demolition works
    • Kalbadevi Station - King Post works
    • Station Chatrapati Shivaji - Concourse to roof wall
    • Station Chatrapati Shivaji - Roof slab
    • Station Chatrapati Shivaji - Station walls
    • Grant Road Station - Sewerline chamber works
    • Girgaon Station - Excavation station box
    • CSMT
    • CSMT
    • Girgaon Station works
    • Grant Road station works
    • Grant Road station - Decking and strut works
    • CSMT
    • Girgaon station - Work in progress
    • CST - Sump Works
    • Girgaon Station - Secant Pile works
    • Grant Road Station - Garden area decking
    • Grant Road Station - Traffic Deck Completed
    • Grant Road Station - Traffic Deck Completed
    • Station Chatrapati Shivaji - base to Concourse wall
    • Station Chatrapati Shivaji - Base to concourse wall Concreting
    • Station Chatrapati Shivaji - Concourse. to Roof wall works
    • Grant Road Station - Traffic decking works completed
    • Grant Road Station - Traffic decking crash barriers
    • Station Chatrapati Shivaji - Concourse to Roof Wall (2nd lift)
    • Station Chatrapati Shivaji - Base Slab Pour - 06
    • Station Chatrapati Shivaji - Wall and column works
    • Grant Road Station - Sewerline & Decking works
    • Grant Road Station - Sewerline & Decking works
    • Grant Road Station - Sewerline & Decking works
    • Grant Road Station - Capping BEam Breaking
    • Grant Road Station - Sewer and Decking Works
    • Grant Road Station - Sewer Line Excavation works
    • Grant Road Station - Sewerline wokrks
    • Tunnel Rail Maintenance
    • Station Chatrapati Shivaji - Base Slab Pour-05 Reinforcement Works
    • Station Chatrapati Shivaji - Column works
    • Station Chatrapati Shivaji - Wall Construction
    • Grant Road Station - Sewerline Diversion
    • Station Chatrapati Shivaji Pour04 base slab concreting
    • Girgaon Station - building demolition
    • Grant Road Station - Sewerline diversion works
    • Grant Road Station - Sewerline diversion works
    • Grant Road Station - Sewerline diversion works
    • CST - Station Concourse
    • CST - Station base slab front
    • CST - Station Excavation
    • Girgaon - Building Demolition
    • Girgaon Station Demolition wroks
    • Grant Road Station - Sewerline diversion works
    66
    Package - 2 ( CST-Kalbadevi-Girgaon-Grant Road )
    22/09/2019
    • Internationalairport Station
    • Sahar Road Station
    • Domestic Airport Station
    • Domestic Station
    • International Station
    • Sahar Road Station
    • NATM Entry at Domestic Airport Station
    • NATM Entry at Domestic Airport Station
    • International Airport Station
    • NATM Entry Exit work at CSIA T1
    • Sahar Road Station Launching Shaft
    • Domestic Station
    • Sahar Station
    • International Station
    • Tunnel
    • Domestic Station
    • Domestic Station
    • International Station
    • Sahar Station
    • Tunnel
    • Domestic Station
    • International Station
    • NATM
    • Sahar Station
    • Domestic Station
    • International Station
    • NATM
    • Sahar Station
    • TBM
    • Domestic Station
    • International Station
    • NATM
    • Sahar
    • Sahar
    • Domestic Airport Station
    • Domestic Airport Station
    • International Airport Station
    • International Airport Station
    • Sahar Road Station
    • Sahar Road Station
    • Sahar road Station
    • Sahar road Station
    • Sahar road Station
    • Domestic Airport station excavation work
    • Domestic Airport station excavation work
    • International Airport Station
    • NATM Exacavtion at Domestic Airport Station
    • Base to Concourse Column casting at Domestic Airport Station
    • Excavation at Domestic Airport Station
    • Shifting of TBM from SSR to CSIA-T2
    • Grid 13-18 column casting at Sahar Road Station
    • Grid 30.85-32.35 Base Slab casting at International Airport Station
    • Grid 30.85-32.35 Base Slab casting at International Airport Station
    • Excavation below utility hanging work at Sahar road station
    • Station box work at CSIA - T2
    • International Airport Station
    • Station box work at CSIA - T2
    • Domestic airport station
    • International Airport Station
    • International Airport Station
    • Retrival shaft work at Sahar
    • Retrival shaft work at Sahar
    • Sahar road metro station work
    • T1 station excavation work
    • Utility hanging work at Sahar road station
    • T2 station box
    • Station wall shuttering work at Sahar road station
    • Excavation work at Domestic Airport Station
    • Erection of tower crane at Domestic Airport Station
    • Tower crane completion at Sahar Road Station
    • Base Slab(G15.35-16.85) reinforcement at International Airport Station
    • Excavation at Sahar Road Station
    • Waler beam work at Domestic airport station
    • Excavation at Domestic airport station
    • Reinforcement of base slab at Domestic airport station
    • Excavation at International airport station
    • 1800 mm Dia. water line Diversion at CSIA Domestic Station
    • 900 mm Storm water drain at CSIA Domestic Station
    • Casting Yard
    • Gantry
    80
    Package - 6 (CSA(domestic)-CSA(international)-Sahar )
    15/09/2019
    • Shitladevi Shaft
    • Shitladevi Shaft
    • Dadar base
    • Shitladevi Shaft
    • Tunnel cross passage
    • Siddhivinayak Excavation site
    • Nayanagar
    • Casting Yard
    • Casting Yard
    • Dadar
    • Dadar
    • Shitladevi
    • Siddhivinayak
    • Siddhivinayak
    • Casting Yard
    • Dadar
    • Nayanagar
    • Shitladevi
    • Dadar
    • Traffic Diversion
    • TBM - 2
    • Dadar
    • Shitladevi
    • Siddhivinayak
    • Dadar secant piling
    • Dadar toolbox
    • Nayanagar TBM - 1
    • Nayanagar TBM - 2
    • Shitladevi box overview
    • Nayanagar Shaft
    • Siddhivinayak Excavation
    • Cage preparation - Sitladevi
    • King post pile - Dadar
    • Siddhivinayak shaft excavation works
    • TBM Nayanagar
    • TBM Nayanagar
    • Aerial view of Nayanagar Site
    • Dadar
    • Dadar Construction Site
    • Aerial view of Siddhivinayak construction site.
    • Aerial view of Siddhivinayak construction site.
    • Segment Casting
    • Casting Yard
    • Shitladevi
    • Shitladevi
    • Siddhivinayak piling
    • Siddhivinayak piling
    • Casting Yard
    • Casting Yard
    • Nayanagar Shaft
    • Casting Yard
    • Dadarf road Diversion
    • Shitladevi road diversion
    • Nayanagar Shaft
    • Casting Yard Segments
    • Traffic Diversion Dadar
    • Guide wall casting at Dadar
    • Nayanagar Shaft Excavation
    • Nayanagar Shaft Excavation
    • Segment stacking
    • Traffic Diversion Dadar
    • Utility Diversion Dadar
    • Ring assembly testing
    • Nayanagar Excavation
    • Nayanagar Excavation
    • Nayanagar Excavation
    • Casting Yard segment casting
    • Casting Yard stacking bay
    • Bus queue shelter shifting
    • Shitladevi transplantation
    • Aarey transplantation
    • Nayanagar
    • Siddhivinayak
    • Siddhivinayak
    • Dadar traffic diversion
    • Dadar tree cutting
    • Dadar Utility Diversion
    • Shitladevi road works
    • Casting Yard - Segment casting
    • Dadar road works
    • Dadar & Shitladevi road works
    82
    Package - 4 ( Siddhivinayak-Dadar-Shitladevi )
    28/07/2019
    • The workshops were conducted between 9-11 July by MMRC & ORF
    • This helped participants streamline objectives & approach towards solutions.
    • Glimpses of the workshop conducted by MMRC & ORF
    • Glimpses of the workshop conducted by MMRC & ORF
    • Glimpses of the workshop conducted by MMRC & ORF
    • Glimpses of the workshop conducted by MMRC & ORF
    • Glimpses of the workshop conducted by MMRC & ORF
    • Glimpses of the workshop conducted by MMRC & ORF
    8
    Mentoring workshops conducted by MMRC for Station Area...
    12/07/2019
    • Tree Plantation at Aarey Colony
    • Tree Plantation at Aarey Colony
    • Tree Plantation at Aarey Colony
    • Tree Plantation at Aarey Colony
    • Tree Plantation at Aarey Colony
    • Tree Plantation at Aarey Colony
    • Tree Plantation at Aarey Colony
    • Tree Plantation at Aarey Colony
    • Tree Plantation at Aarey Colony
    • Tree Plantation at Aarey Colony
    • Tree Plantation at Aarey Colony
    11
    MMRCL Tree Plantation at Aarey Colony
    05/07/2019
Top