Sr. No. Title Type Tender Ref No Date Of Issue Download
101 Invitation for Bids "Supply of 2250 MT Rails (UIC 60E1, IRS-T-12:2009, 880 grade) for Track work of Mumbai Metro line 3 (Colaba-Bandra-SEEPZ) Rail Project." Invitation for Bids MM3-CBS-TWK-05 (Package - 10E) 23/08/2019 file
102 Construction of residential cum commercial high-rise building at Kalbadevi CS No. 662 and 1/662 of Bhuleshwar division for rehabilitation of Metro Line-3 Project Affected Persons of Kalbadevi and Girgaon Corrigendum 2 MMRC/Planning/NIT/K3/19/08 20/08/2019 file
103 Design, Manufacture, Supply, Installation, Testing & Commissioning of Rescue Vehicle (Rail-cum-Road Vehicle with Re-Railing & Rescue Equipment) RFP MM3-CBS-DEQ-9-04 20/08/2019 file
104 Design, Manufacture, Supply, Installation, Testing & Commissioning of Rescue Vehicle (Rail-cum-Road Vehicle with Re-Railing & Rescue Equipment) Invitation for Bids MM3-CBS-DEQ-9-04 20/08/2019 file
105 Appointment of Travel Agency for Bus service Corrigendum 2 MMRCL/Admin/E-Tender/Bus Service/2019 19/08/2019 file
106 Invitation of Tender for Hiring of Office Premises in the vicinity of MMRCL Transit Office Building, North Side of City Park, E Block, Bandra Kurla Complex, Bandra (E), Maharashtra - 400051. Notice MMRC/Planning 16/08/2019 file
107 Construction of residential cum commercial high-rise building at Kalbadevi CS No. 662 and 1/662 of Bhuleshwar division for rehabilitation of Metro Line-3 Project Affected Persons of Kalbadevi and Girgaon. Addendum No 1 MMRC/Planning/NIT/K3/19/08 07/08/2019 file
108 Appointment of Travel Agency for Bus service Corrigendum 2 MMRCL/Admin/E-Tender/Bus Service/2019 06/08/2019 file
109 Part Design, Procurement and Part Supply, Installation, Testing and Commissioning of Ballastless Track on the Mainline from Aarey station (excluded) until BKC station (included) and Ballasted Track in the area of at-grade Aarey Station and in the Depot area of Mumbai Metro Line 3 (Colaba – Bandra – SEEPZ) and Procurement and Supply of Turnouts, Scissor Crossovers and Buffer Stops for the entire Mainline for Mumbai Metro Line 3 (Colaba – Bandra – SEEPZ) including Package 10 B. Addendum No 1 MM3-CBS-TWK-03 02/08/2019 file
110 Part Design, Procurement and Part Supply, Installation, Testing and Commissioning of Ballastless Track on the Mainline from Aarey station (excluded) until BKC station (included) and Ballasted Track in the area of at-grade Aarey Station and in the Depot area of Mumbai Metro Line 3 (Colaba – Bandra – SEEPZ). and Procurement and Supply of Turnouts, Scissor Crossovers and Buffer Stops for the entire Mainline for Mumbai Metro Line 3 (Colaba – Bandra – SEEPZ) including Package 10 B. Notice MM3-CBS-TWK-03 31/07/2019 file