Sr. No. Title Type Tender Ref No Date Of Issue Download
1 Notice is hereby given to general public that Mumbai Metro Rail Corporation proposes to acquire properties described in following schedule for the public purpose of Metro Line 3 (Colaba-Bandra-Seepz) Notice MMRDA/MMRC 19/05/2017 file
2 Invitation for Prequalification of bidders for Design, Manufacture, Supply, Installation, Testing and Commissioning of Rolling Stock. Addendum No 17 MM3-CBS-RS 18/05/2017 file
3 Procurement, Supply, Installation, Testing and Commissioning of various Power Supply works including associated Civil works, required for diversion of 220 kV and 33 kV Transmission Lines along with the Transmission towers belonging to M/s Reliance Infrastructure Ltd. in Aarey depot area for Mumbai Metro Line -3 Addendum No 2 MM3-CBS-REL-PYL 16/05/2017 file
4 Procurement, Supply, Installation, Testing and Commissioning of various Power Supply works including associated Civil works, required for diversion of 220 kV and 33 kV Transmission Lines along with the Transmission towers belonging to M/s Reliance Infrastructure Ltd. in Aarey depot area for Mumbai Metro Line -3 Pre-Bid Query Response MM3-CBS-REL-PYL 16/05/2017 file
5 Invitation for Prequalification of bidders for Procurement of Part Design, Supply, Installation, Testing and Commissioning of Ballastless track for underground section from Aarey to Cuffe Parade, Ballasted Track in the area of at-grade Aarey station and in the Depot for the Mumbai Metro Line 3. PQ Document MM3-CBS-TWK 11/05/2017 file
6 Invitation for Prequalification of bidders for Procurement of Part Design, Supply, Installation, Testing and Commissioning of Ballastless track for underground section from Aarey to Cuffe Parade, Ballasted Track in the area of at-grade Aarey station and in the Depot for the Mumbai Metro Line 3. IFP Document MM3-CBS-TWK 11/05/2017 file
7 Transport arrangements for shifting of PAPs in andheri(east) limit from MIDC to Chakala Notice MMRC/Pkg-7/Transport-MIDC/NIT/2 nd call/17 09/05/2017 file
8 Procurement, Supply, Installation, Testing and Commissioning of various Power Supply works including associated Civil works, required for diversion of 220 kV and 33 kV Transmission Lines along with the Transmission towers belonging to M/s Reliance Infrastructure Ltd. in Aarey depot area for Mumbai Metro Line -3 Addendum No 1 MM3-CBS-REL-PYL 03/05/2017 file
9 Invitation for Prequalification of bidders for Design, Manufacture, Supply, Installation, Testing and Commissioning of Rolling Stock Pre-Bid Query Response MM3-CBS-RS 02/05/2017 file
10 Invitation for Prequalification of bidders for Design, Manufacture, Supply, Installation, Testing and Commissioning of Rolling Stock Addendum No 16 MM3-CBS-RS 02/05/2017 file

Stay Informed

CAPTCHA

Please enter the letters displayed in the image below. If the image is not clear, click on "Can't read the text? Get a new image"

Image CAPTCHA
Top