Sr. No. | Title | Type | Tender Ref No | Date Of Issue | Download |
---|---|---|---|---|---|
1 | Invitation for Prequalification of bidders for Design, Manufacture, Supply, Installation, Testing and Commissioning of Rolling Stock. | Pre-Bid Query Response | MM3-CBS-RS | 31/05/2017 | file |
2 | Invitation for Prequalification of bidders for Design, Manufacture, Supply, Installation, Testing and Commissioning of Rolling Stock. | Addendum No 17 | MM3-CBS-RS | 18/05/2017 | file |
3 | Invitation for Prequalification of bidders for Design, Manufacture, Supply, Installation, Testing and Commissioning of Rolling Stock | Pre-Bid Query Response | MM3-CBS-RS | 02/05/2017 | file |
4 | Invitation for Prequalification of bidders for Design, Manufacture, Supply, Installation, Testing and Commissioning of Rolling Stock | Addendum No 16 | MM3-CBS-RS | 02/05/2017 | file |
5 | Invitation for Prequalification of bidders for Design, Manufacture, Supply, Installation, Testing and Commissioning of Rolling Stock | Addendum No 15 | MM3-CBS-RS | 20/04/2017 | file |
6 | Invitation for Prequalification of bidders for Design, Manufacture, Supply, Installation, Testing and Commissioning of Rolling Stock. | Addendum No 14 | MM3-CBS-RS | 22/03/2017 | file |
7 | Invitation for Prequalification of bidders for Design, Manufacture, Supply, Installation, Testing and Commissioning of Rolling Stock | Addendum No 13 | MM3-CBS-RS | 14/02/2017 | file |
8 | Invitation for Prequalification of bidders for Design, Manufacture, Supply, Installation, Testing and Commissioning of Rolling Stock | Addendum No 12 | MM3-CBS-RS | 10/01/2017 | file |
9 | Invitation for Prequalification of bidders for Design, Manufacture, Supply, Installation, Testing and Commissioning of Rolling Stock | Addendum No 11 | MM3-CBS-RS | 30/11/2016 | file |
10 | Invitation for Prequalification of bidders for Design, Manufacture, Supply, Installation, Testing and Commissioning of Rolling Stock | Addendum No 10 | MM3-CBS-RS | 04/11/2016 | file |
"उद्देशप्राप्तीच्या दिशेने आखलेले प्रकल्प वेगाने वाटचाल करु लागतात तेव्हा ती एक प्रशंसनीय बाब ठरते. मेट्रो-३ (कुलाबा-वांद्रे-सीप्झ) हा ३३. किमी प्रकल्पाची प्रगती देखील अशीच वेगाने होत आहे. मुंबईतील वाहतुकीची कोंडी टाळण्यासाठी ठरवलेल्या वेळेत प्रकल्प पूर्ण करण्यास आम्ही कटिबद्ध आहोत. मेट्रो वाहतूक ही पर्यावरणपूरक असून मेट्रोमुळे कार्बन उत्सर्जन व प्रदूषण कमी करण्यास मदत होईल "
"The city of Mumbai requires a ‘metro’ to reclaim its lost glory and I, on behalf of the Centre, promise all help to the State. Implementing infrastructure projects in a city like Mumbai isn’t an easy job. It requires positive attitude. Of course, I’m sure the people of this never-say-stop city will lend their wholehearted support to the 33.5-km long Colaba-Bandra-SEEPZ Metro-3 underground corridor.”