Togel online resmi
  • situs judi slot online terpercaya 2020
  • slot online terpercaya
  • situs judi slot online terpercaya
  • Situs Judi Slot Online Gampang Menang Bonus New Member 100
  • Situs Judi Slot Online Gampang Menang
छायाचित्र दालन (Photo Gallery) | MMRC
Skip to main content
  • Accessibility And Screen Reader Options
  • English
  • मराठी
  • हिन्दी

A A A

Homepage Logo मुंबई मेट्रो रेल कॉर्पोरेशन मर्यादित (भारत सरकार व महाराष्ट्र शासन याचा संयुक्त प्रकल्प)

mmrc

Search form
मुखपृष्ट MMRC
  • मुखपृष्ठ
  • मुं.मे.रे.कॉ. बद्दल
    • आपल्या मेट्रोला जाणून घ्या
    • आमचे स्वप्न, ध्येय व मुल्ये
    • संचालक मंडळ
    • आमची व्यवस्थापकीय टीम
    • आमची संघटना
    • अहवाल व कागदपत्रे
    • MOA & AOA
    • Managing Director
    • वार्षिक अहवाल
  • प्रकल्प
    • प्रकल्पाचा मार्ग
    • प्रकल्पाचा कालावधी
    • प्रकल्पासाठी निधी
    • उदाहरणार्थ आरेखने
    • आमचे तंत्रज्ञान
    • सुविधांचे स्थलांतर करण्यासाठी नमुना योजना
    • पुनर्वसन व पुनर्स्थापना (आर & आर )
      • एफ एल जी आर सी/एस एल जी आर सी
      • सार्वजनिक सल्ला
      • अंतिम बीएसईएस
      • लॉटरी परिणाम
      • धोरण
      • इन-सिटू आर & आर कार्यालय पत्ता
      • बीएसईएस सर्वेक्षण नकाशे
    • मुंबई मेट्रो -३ चे फायदे
    • पर्यावरणीय लाभ
    • आमचे सल्लागार
    • नोटीस
    • नाहरकत प्रमाण पत्र
    • प्रकल्प अहवाल व कागदपत्रे
    • वाहतुक वळविण्याची नमुना योजना
  • लोक संबंध
    • नियमित विचारले जाणारे प्रश्न
      • आरे
      • काळबादेवी व गिरगाव
    • आरे विषयीचे तथ्य
    • मुंबई मेट्रो लाईन ३ – वैशिष्ट्ये
  • निविदा
    • प्रणाली
      • डेपो (एम व पी)
      • विद्युत
      • सिग्नल आणि दूरसंचार
      • रोलिंग स्टॉक
      • माहिती तंत्रज्ञान
    • वित्त
    • स्थापत्य
    • विविध
    • पुरस्कृत करार
    • मुंबई मेट्रो रेल कॉर्पोरेशनचे कंत्राटदार
    • eनिविदा
  • मीडिया केंद्र
    • दालन
      • चित्रफीत दालन
      • छायाचित्र दालन
    • बातम्या
    • वृत्तपत्र
    • व्यवस्थापकीय संचालकांचे मनोगत
    • पत्रकार प्रकाशन
    • सोशल मीडिया
      • Facebook
      • Instagram
      • Twitter
      • Youtube
  • रोजगार
    • नोकरी विषयक
    • अंतरवासित धोरण
  • माहिती अधिकार
    • माहिती अधिकार अधिनियम ( भारत सरकार )
    • माहिती अधिकार अधिनियम ( महाराष्ट्र सरकार )
    • माहितीचा अधिकार २००५
    • माहिती अधिकार/सनद
    • सार्वजनिक माहिती अधिकारी / सहाय्यक सार्वजनिक माहिती अधिकारी
    • दक्षता
  • संपर्क
    • अनुपालन अधिकारी आणि कंपनी सचिव
    • आमच्याकडे कसे पोहोचाल
  • Policies
फ्लॅश न्युज
  • The MMRCL cautions one and all of Fake appointment letters for Metro-3 corridorThe MMRCL cautions one and all of Fake appointment letters for Metro-3 corridor
  • MMRC Control room numbers :- 9136805065 / 7506706477Pre-Bid Meeting of supply, delivery, plantation and maintenance of advance sized nursery grown trees in Mumbai, Pacakge-20
  • RFP for Preparation of Detailed Project Report for Direct Pedestrian Subway Connection Between Metro Line 3 Stations and Adjoining Developments RFP for Preparation of Detailed Project Report for Direct Pedestrian Subway Connection Between Metro Line 3 Stations and Adjoining Developments
  • MMRC calendar 2022 MMRC calendar 2022
  1. मुखपृष्ट
  2. मीडिया केंद्र
  3. दालन
  4. छायाचित्र दालन (Photo Gallery)
MMRC logo

छायाचित्र दालन (Photo Gallery)

MMRC
MMRC
    • Fifth TBM breakthrough for Mumbai Metro 3 corridor at Chhatrapati Shivaji Maharaj International Airport- T2 metro station.
    • Starting it's course under Metro Line 1 at MarolNaka The 92 mtr long TBM Wainganga-3 tunneled at an average of 4.2 mtrs daily through the rocky strata made of Basalt, volcanic Breccia shaping the tunnel with 937 RCC cement rings.
    • Starting it's course under Metro Line 1 at MarolNaka The 92 mtr long TBM Wainganga-3 tunneled at an average of 4.2 mtrs daily through the rocky strata made of Basalt, volcanic Breccia shaping the tunnel with 937 RCC cement rings.
    Fifth TBM breakthrough for Mumbai Metro 3 corridor.
    13/02/2019
    3
    • Tunneling by New Austrian Tunneling Method (NATM ) commenced.
    • Tunneling commenced at the south end of BKC Station for the 153m long tunnel below Mithi River.
    • Tunneling commenced at the south end of BKC Station for the 153m long tunnel below Mithi River.
    • This will facilitate stabling of spare train during operations and also act as a Sick Siding.
    Tunneling by New Austrian Tunneling Method (NATM )...
    06/02/2019
    4
    • MMRC successfully conducts its first twin tunnel breakthrough at Dadar Metro station. TBM Krishna 1 and 2 have tunneled from Nayanagar to Dadar.
    • First Twin Tunnel Breakthrough of Mumbai Metro Line - 3 Project
    • A Herrenknecht make TBMs Krishna 1 & 2 equipped with Earth Pressure Balance Tech tunneled their way through the rocky strata made of Basalt, Breccia & tuff for 506 & 479 days.
    • With this feat MMRC achieves 35% of total work completion which includes 18Kms of tunneling.
    First Twin Tunnel Breakthrough of Mumbai Metro Line - 3...
    31/01/2019
    4
    • This MMRC Art Initiative comprises of paintings done by students from Sir JJ School Of Arts
    • This MMRC Art Initiative comprises of paintings done by students from Sir JJ School Of Arts
    • This MMRC Art Initiative comprises of paintings done by students from Sir JJ School Of Arts
    • This MMRC Art Initiative comprises of paintings done by students from Sir JJ School Of Arts
    • This MMRC Art Initiative comprises of paintings done by students from Sir JJ School Of Arts
    • This MMRC Art Initiative comprises of paintings done by students from Sir JJ School Of Arts
    • This MMRC Art Initiative comprises of paintings done by students from Sir JJ School Of Arts
    MMRCL Calendar 2019
    01/01/2019
    7
    • MD. MMRC, Ms. Ashwini Bhide along with Dir. Projects, Mr. S.K.Gupta, Dir. Systems, Mr. A.A.Bhatt, Dir. Finance, Mr. Abodh.Khandelwal & ED. Planning, Mr. R.Ramana unveiled the calendar for the year 2019
    • MD. MMRC, Ms. Ashwini Bhide along with senior officials of MMRC
    • MD. MMRC, Ms. Ashwini Bhide along with senior officials of MMRC
    Unveiling of MMRCL Calendar 2019
    01/01/2019
    3
    • MD. MMRC, Ms. Ashwini Bhide during the second TBM breakthrough at SEEPZ
    • MMRC completes tunneling of about 15 KMs
    • Wainganga-2 from PKG 7 makes a second breakthrough at SEEPZ station after tunneling a distance of 568 mtrs over 125 days
    • MMRC accomplishes second tunnel breakthrough at SEEPZ
    • MD. MMRC, Ms. Ashwini Bhide along with Dir. Projects, Mr. S.K.Gupta and Dir. Systems, Mr. A.A. Bhatt witnessed the Second TBM breakthrough at SEEPZ
    Second TBM Breakthrough of Mumbai Metro - 3
    26/12/2018
    5
    • 1m Dia. Twin pipe for storm water drain diversion at Santacruz Metro Station
    • 1800 mm Dia. water line diversion at CSIA Domestic Station
    • 900 mm Storm water drain at CSIA Domestic Station
    • Suspender Erection at Utility Support System at Sahar Road Station
    • Tata Oil filled cable supporting in On Road portion at Vidhan Bhavan Station
    • Excavation progress in Grid 19-24 at Hutatma Chowk Station
    • Cable Tray Arrangement supported on Capping Beam for TATA Submarine Cable diversion at Dharavi Station
    • Hanging Arrangement across the Station for Diversion of TATA Submarine Cables at BKC Station
    • Multiple Water Pipelines of Dia (2.7m,-2.4m,-1.45m,-0.6m) Supported by Suspended Erection at Sahar Road Station
    • SEEPZ
    • Girgaon Station Phase - 05 Trenching for utility diversion
    • Support of xx mm Dia Water Pipe Line Beneath the station Box at Worli Station
    • Support of xx mm Dia Water Pipe Line Beneath the station Box at Worli Station
    • Truss Arrangement to House Multiple Mega Utilities at Sahar Road Station
    • UGC07 SEEPZ Station 900 mm Dia waterline supporting works.
    • Vidyanagari Station
    Utility Shifting
    15/11/2018
    16
    • Commencement of initial drive for the first TBM ( WAINGANGA-1) of Package-07
    • The TBM will bore the tunnel from Pali Ground, Marol to CSIA-T2
    • Commencement of initial drive for the first TBM ( WAINGANGA-1) of Package-07
    Commencement of initial drive for the first TBM ( WAINGANGA...
    08/01/2018
    3
    • TBM lowered at Vidyanagari launching shaft.
    • Cutter head of Godavari-1 TBM lowered at Vidyanagari launching shaft.
    • Cutter head of Godavari-1 TBM lowered at Vidyanagari launching shaft.
    • U.P.S. Madan, MC, MMRDA; Deepak Kapoor, CEO, SRA; Milind Mhaiskar, VP and CEO, MAHAD; Sumant Bhange, CO RR Board MAHADA along with Ashwini Bhide, MD MMRC and other senior officials at Vidyanagari lanching shaft witnessing the lowering of cutter head.
    • U.P.S. Madan, MC, MMRDA; Deepak Kapoor, CEO, SRA; Milind Mhaiskar, VP and CEO, MAHAD; Sumant Bhange, CO RR Board MAHADA along with Ashwini Bhide, MD MMRC and other senior officials at Vidyanagari lanching shaft witnessing the lowering of cutter head.
    • Cutter head of Godavari-1 TBM lowered at Vidyanagari launching shaft.
    Lowering of TBM at Vidyanagari launching shaft
    21/12/2017
    6
  • ‹ previous
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • next ›
MMRC

Recent News

mmrc
कुलाबा-वांद्रे-सीप्झ या मेट्रो 3 मार्गाचे काम संध्या वेगाने सुरू असून
+19 मे 2022
मेट्रो 3 कॉरिडोर का 98.9% मार्ग त्यार
+09 मे 2022
मेट्रो ३ टनलिंग का 99 प्रतिशत मार्ग तैयार
+09 मे 2022
When will Metro work will end? Good news:73% of it is ready
+09 मे 2022
मेट्रो लावणार एक हजार झारे
+13 Apr 2022
मेट्रो ३ के लिए 250 करोड़ मंजूर
+23 Mar 2022
Previous Pause Next
MMRC

मुं.मे.रे.म. बद्दल

  • निविदा
  • प्रकल्प
  • बातम्या
  • आमच्याशी संपर्क साधा
  • eनिविदा
MMRC

उपयुक्त माहिती

  • प्रकल्प मार्ग
MMRC

धोरणे

  • हरित धोरण
  • अस्वीकृती
  • गोपनीयता धोरण
MMRC

इतर शासकीय साइट

  • भारत सरकार
  • MoHUA
  • भारतीय रेल्वे
  • महाराष्ट्र सरकार
  • एमएमआरडीए
  • इतर मेट्रो
MMRC
  • mmrc
  • mmrc
  • mmrc
MMRC

MMRC © 2019. All rights are reserved.

  • mmrc
  • mmrc
  • mmrc
Top