imageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimage
imageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimage
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc

Nayanagar, Mahim Map No. 16A

BKC Station Map No. 18

Agripada Map No. 20A

Bimonthly News Letter December 2016

Package - 3

Sr. No Nature of Work Status
1 Tunneling & Segment Production Progress

Science Museum-Worli ( Tanasa-1) - 320/1381 rings has been erected

2nd TBM Science Museum-Worli ( Tanasa-2) - 31/1381  rings has been erected.

Segment Production Progress:

42.5 %  of the total scope of permanent rings has been completed.

Package - 7

Sr. No Nature of Work Status
1 Tunneling & Segment Production Progress 

Wainganga-1

Drive-1 (From Pali ground to CSIA-T2) (UpLine) -

Completed 1262rmt, Made Breakthrough on 24/09/2018.

Drive-2 (From Pali Ground to SEEPZ) (UpLine) -

668rmt completed out of 1689rmt.

Wainganga-2:

Package - 1

Sr. No Nature of Work Status
1 Tunneling Progress & Segment Production Progress

Ring Building

TBM 1: Total completed: 957, Scope: 2,932

TBM 2: Total completed: 724.5 Scope: 2962

NATM Tunnels(rmtr)

Upline: Total completed: 23.15 Scope: 215.97

Downline: Total completed: 24.25 Scope: 217.07

Package - 6

Sr. No Nature of Work Status
1 Tunneling & Segment Production Progress 

CSIA T2 Metro Station

Tunnel CSIA T2 to Sahar Road Station (Downline):

Package - 5

Sr. No Nature of Work Status
1 Tunneling & Segment Production Progress

TBM Drive - VDN to SC-Godavari 01-Upline

 Permanent Rings: Scope - 2074, Total progress - 1771

Sacrificial Rings - Scope - 9, Total Progress - 9

TBM Drive - VDN to SC-Godavari 02-Downline

Package - 2

 Sr. No Nature of Work Status
1 Tunneling & Segment Production Progress

TBM - 1

Temporary ring: Total progress - 12, Scope - 12

CST - SKD: Total progress - 476, Scope - 476