imageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimage
imageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimage
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc
  • mmrc

Lottery Reports of Naya Nagar - MAP NO. 16A

Lottery Reports of Dharavi - MAP NO. 17

Sahar Road Map No. 22

Nayanagar, Mahim Map No. 16A

BKC Station Map No. 18

Agripada Map No. 20A

Bimonthly News Letter December 2016

Package - 3

Sr. No Nature of Work Status
1 Tunneling & Segment Production Progress

Science Museum-Worli ( Tanasa-1) - 436/1381 rings has been erected

2nd TBM Science Museum-Worli ( Tanasa-2) - 326/1381  rings has been erected.

Segment Production Progress:

47.6 %  of the total scope of permanent rings has been completed.

Package - 7

Sr. No Nature of Work Status
1 Tunneling & Segment Production Progress 

Wainganga-1

Drive-1 (From Pali ground to CSIA-T2) (UpLine) -

Completed 1262rmt, Made Breakthrough on 24/09/2018.

Drive-2 (From Pali Ground to SEEPZ) (UpLine) -

689rmt completed out of 1689rmt.

Made Breakthrough at MIDC station on 14/03/2019