Photo Gallery

    • Tree Plantation at Aarey Colony
    • Tree Plantation at Aarey Colony
    • Tree Plantation at Aarey Colony
    • Tree Plantation at Aarey Colony
    • Tree Plantation at Aarey Colony
    • Tree Plantation at Aarey Colony
    • Tree Plantation at Aarey Colony
    • Tree Plantation at Aarey Colony
    • Tree Plantation at Aarey Colony
    • Tree Plantation at Aarey Colony
    • Tree Plantation at Aarey Colony
    11
    MMRCL Tree Plantation at Aarey Colony
    05/07/2019
    • Mr. R. Ramana , ED (Planning), MMRC, addresses participating students at the workshop that kicks off competition on station area planning & management for MumbaiMetro3 jointly organised by MMRC and ORF Mumbai.
    • 52 teams 238 Innovative minds from 13 Engineering & Architecture colleges across Mumbai participating in the competition.
    • Mr. R. Ramana , ED (Planning), MMRC says, ❝MMRC is happy to take this initiative because learning never stops and who you learn from has no definition.❞
    3
    Glimpses of workshop organised that kicks off competition...
    21/06/2019
    • Fifth TBM breakthrough for Mumbai Metro 3 corridor at Chhatrapati Shivaji Maharaj International Airport- T2 metro station.
    • Starting it's course under Metro Line 1 at MarolNaka The 92 mtr long TBM Wainganga-3 tunneled at an average of 4.2 mtrs daily through the rocky strata made of Basalt, volcanic Breccia shaping the tunnel with 937 RCC cement rings.
    • Starting it's course under Metro Line 1 at MarolNaka The 92 mtr long TBM Wainganga-3 tunneled at an average of 4.2 mtrs daily through the rocky strata made of Basalt, volcanic Breccia shaping the tunnel with 937 RCC cement rings.
    3
    Fifth TBM breakthrough for Mumbai Metro 3 corridor.
    13/02/2019
    • Tunneling by New Austrian Tunneling Method (NATM ) commenced.
    • Tunneling commenced at the south end of BKC Station for the 153m long tunnel below Mithi River.
    • Tunneling commenced at the south end of BKC Station for the 153m long tunnel below Mithi River.
    • This will facilitate stabling of spare train during operations and also act as a Sick Siding.
    4
    Tunneling by New Austrian Tunneling Method (NATM )...
    06/02/2019
    • MMRC successfully conducts its first twin tunnel breakthrough at Dadar Metro station. TBM Krishna 1 and 2 have tunneled from Nayanagar to Dadar.
    • First Twin Tunnel Breakthrough of Mumbai Metro Line - 3 Project
    • A Herrenknecht make TBMs Krishna 1 & 2 equipped with Earth Pressure Balance Tech tunneled their way through the rocky strata made of Basalt, Breccia & tuff for 506 & 479 days.
    • With this feat MMRC achieves 35% of total work completion which includes 18Kms of tunneling.
    4
    First Twin Tunnel Breakthrough of Mumbai Metro Line - 3...
    31/01/2019
    • This MMRC Art Initiative comprises of paintings done by students from Sir JJ School Of Arts
    • This MMRC Art Initiative comprises of paintings done by students from Sir JJ School Of Arts
    • This MMRC Art Initiative comprises of paintings done by students from Sir JJ School Of Arts
    • This MMRC Art Initiative comprises of paintings done by students from Sir JJ School Of Arts
    • This MMRC Art Initiative comprises of paintings done by students from Sir JJ School Of Arts
    • This MMRC Art Initiative comprises of paintings done by students from Sir JJ School Of Arts
    • This MMRC Art Initiative comprises of paintings done by students from Sir JJ School Of Arts
    7
    MMRCL Calendar 2019
    01/01/2019
    • MD. MMRC, Ms. Ashwini Bhide along with Dir. Projects, Mr. S.K.Gupta, Dir. Systems, Mr. A.A.Bhatt, Dir. Finance, Mr. Abodh.Khandelwal & ED. Planning, Mr. R.Ramana unveiled the calendar for the year 2019
    • MD. MMRC, Ms. Ashwini Bhide along with senior officials of MMRC
    • MD. MMRC, Ms. Ashwini Bhide along with senior officials of MMRC
    3
    Unveiling of MMRCL Calendar 2019
    01/01/2019
    • MD. MMRC, Ms. Ashwini Bhide during the second TBM breakthrough at SEEPZ
    • MMRC completes tunneling of about 15 KMs
    • Wainganga-2 from PKG 7 makes a second breakthrough at SEEPZ station after tunneling a distance of 568 mtrs over 125 days
    • MMRC accomplishes second tunnel breakthrough at SEEPZ
    • MD. MMRC, Ms. Ashwini Bhide along with Dir. Projects, Mr. S.K.Gupta and Dir. Systems, Mr. A.A. Bhatt witnessed the Second TBM breakthrough at SEEPZ
    5
    Second TBM Breakthrough of Mumbai Metro - 3
    26/12/2018
    • 1m Dia. Twin pipe for storm water drain diversion at Santacruz Metro Station
    • 1800 mm Dia. water line diversion at CSIA Domestic Station
    • 900 mm Storm water drain at CSIA Domestic Station
    • Suspender Erection at Utility Support System at Sahar Road Station
    • Tata Oil filled cable supporting in On Road portion at Vidhan Bhavan Station
    • Excavation progress in Grid 19-24 at Hutatma Chowk Station
    • Cable Tray Arrangement supported on Capping Beam for TATA Submarine Cable diversion at Dharavi Station
    • Hanging Arrangement across the Station for Diversion of TATA Submarine Cables at BKC Station
    • Multiple Water Pipelines of Dia (2.7m,-2.4m,-1.45m,-0.6m) Supported by Suspended Erection at Sahar Road Station
    • SEEPZ
    • Girgaon Station Phase - 05 Trenching for utility diversion
    • Support of xx mm Dia Water Pipe Line Beneath the station Box at Worli Station
    • Support of xx mm Dia Water Pipe Line Beneath the station Box at Worli Station
    • Truss Arrangement to House Multiple Mega Utilities at Sahar Road Station
    • UGC07 SEEPZ Station 900 mm Dia waterline supporting works.
    • Vidyanagari Station
    16
    Utility Shifting
    15/11/2018
Top