Skip to main content
  • Accessibility And Screen Reader Options
  • English
  • मराठी
  • हिन्दी

A A A

Homepage Logo Mumbai Metro Rail Corporation Ltd. (JV of Govt. of India and Govt. of Maharashtra)

mmrc

Search form
Home MMRC
  • Home
  • About MMRC
    • Know Your Metro
    • Our Vision, Mission & Values
    • Board of Directors
    • Key Management Team
    • Our Organization
    • Managing Director
    • Reports & Documents
    • MOA & AOA
    • Annual Report
  • Project
    • Project Route
    • Project Timeline
    • Project Funding
    • Illustrative Designs
    • Technology
    • Typical Utility Shifting Plan
    • Project Consultants
    • Benefits of Metro Line 3
    • Environmental Benefits
    • Rehabilitation & Resettlement (R&R)
      • FLGRC/SLGRC
      • Public Consultation
      • Final BSES
      • Lottery Result
      • Policy / Project Documents
      • In - situ R&R Office Address
      • BSES Survey Maps
      • Building wise Allotment List
      • Rehabilitation Building Occupation Certificate
    • Projects Reports & Documents
    • NOC
    • Notice
    • Typical Traffic Diversion Plan
  • People Connect
    • FAQ
      • FAQ on Kalbadevi & Girgaon
      • FAQ on Aarey
    • Facts Of Aarey
    • Quick Facts
  • Tenders
    • Civil
    • System
      • Electrical
      • Signalling & Telecom
      • Rolling Stock
      • IT
      • Depot (M&P)
    • Planning
    • Miscellaneous
    • Awarded Contracts
    • MMRC Contractors
    • eTender
    • EOI-MoHUA
  • Media
    • Gallery
      • Photo Gallery
      • Video Gallery
    • News
    • Newsletters
    • MD Speaks
    • Press Releases
    • Social Media
      • Facebook
      • Instagram
      • Twitter
      • Youtube
  • Careers
    • Recruitment
    • Internship Policy
  • RTI/Vigilance
    • RTI (GOI)
    • RTI (GOM)
    • RTI ACT 2005
    • RTI/SANAD
    • PIO/APIO
    • Vigilance
  • Contact Us
    • How to reach us
    • Compliance Officer & Company Secretary
  • Policies
Flash News
  • The MMRCL cautions one and all of Fake appointment letters for Metro-3 corridorThe MMRCL cautions one and all of Fake appointment letters for Metro-3 corridor
  • MMRC Control room numbers :- 9136805065 / 7506706477Pre-Bid Meeting of supply, delivery, plantation and maintenance of advance sized nursery grown trees in Mumbai, Pacakge-20
  • RFP for Preparation of Detailed Project Report for Direct Pedestrian Subway Connection Between Metro Line 3 Stations and Adjoining Developments RFP for Preparation of Detailed Project Report for Direct Pedestrian Subway Connection Between Metro Line 3 Stations and Adjoining Developments
  • MMRC calendar 2022 MMRC calendar 2022
  1. Home
  2. Media
  3. Gallery
  4. Photo Gallery
MMRC logo

Photo Gallery

MMRC
MMRC
    • Fifth TBM breakthrough for Mumbai Metro 3 corridor at Chhatrapati Shivaji Maharaj International Airport- T2 metro station.
    • Starting it's course under Metro Line 1 at MarolNaka The 92 mtr long TBM Wainganga-3 tunneled at an average of 4.2 mtrs daily through the rocky strata made of Basalt, volcanic Breccia shaping the tunnel with 937 RCC cement rings.
    • Starting it's course under Metro Line 1 at MarolNaka The 92 mtr long TBM Wainganga-3 tunneled at an average of 4.2 mtrs daily through the rocky strata made of Basalt, volcanic Breccia shaping the tunnel with 937 RCC cement rings.
    Fifth TBM breakthrough for Mumbai Metro 3 corridor.
    13/02/2019
    3
    • Tunneling by New Austrian Tunneling Method (NATM ) commenced.
    • Tunneling commenced at the south end of BKC Station for the 153m long tunnel below Mithi River.
    • Tunneling commenced at the south end of BKC Station for the 153m long tunnel below Mithi River.
    • This will facilitate stabling of spare train during operations and also act as a Sick Siding.
    Tunneling by New Austrian Tunneling Method (NATM )...
    06/02/2019
    4
    • MMRC successfully conducts its first twin tunnel breakthrough at Dadar Metro station. TBM Krishna 1 and 2 have tunneled from Nayanagar to Dadar.
    • First Twin Tunnel Breakthrough of Mumbai Metro Line - 3 Project
    • A Herrenknecht make TBMs Krishna 1 & 2 equipped with Earth Pressure Balance Tech tunneled their way through the rocky strata made of Basalt, Breccia & tuff for 506 & 479 days.
    • With this feat MMRC achieves 35% of total work completion which includes 18Kms of tunneling.
    First Twin Tunnel Breakthrough of Mumbai Metro Line - 3...
    31/01/2019
    4
    • This MMRC Art Initiative comprises of paintings done by students from Sir JJ School Of Arts
    • This MMRC Art Initiative comprises of paintings done by students from Sir JJ School Of Arts
    • This MMRC Art Initiative comprises of paintings done by students from Sir JJ School Of Arts
    • This MMRC Art Initiative comprises of paintings done by students from Sir JJ School Of Arts
    • This MMRC Art Initiative comprises of paintings done by students from Sir JJ School Of Arts
    • This MMRC Art Initiative comprises of paintings done by students from Sir JJ School Of Arts
    • This MMRC Art Initiative comprises of paintings done by students from Sir JJ School Of Arts
    MMRCL Calendar 2019
    01/01/2019
    7
    • MD. MMRC, Ms. Ashwini Bhide along with Dir. Projects, Mr. S.K.Gupta, Dir. Systems, Mr. A.A.Bhatt, Dir. Finance, Mr. Abodh.Khandelwal & ED. Planning, Mr. R.Ramana unveiled the calendar for the year 2019
    • MD. MMRC, Ms. Ashwini Bhide along with senior officials of MMRC
    • MD. MMRC, Ms. Ashwini Bhide along with senior officials of MMRC
    Unveiling of MMRCL Calendar 2019
    01/01/2019
    3
    • MD. MMRC, Ms. Ashwini Bhide during the second TBM breakthrough at SEEPZ
    • MMRC completes tunneling of about 15 KMs
    • Wainganga-2 from PKG 7 makes a second breakthrough at SEEPZ station after tunneling a distance of 568 mtrs over 125 days
    • MMRC accomplishes second tunnel breakthrough at SEEPZ
    • MD. MMRC, Ms. Ashwini Bhide along with Dir. Projects, Mr. S.K.Gupta and Dir. Systems, Mr. A.A. Bhatt witnessed the Second TBM breakthrough at SEEPZ
    Second TBM Breakthrough of Mumbai Metro - 3
    26/12/2018
    5
    • 1m Dia. Twin pipe for storm water drain diversion at Santacruz Metro Station
    • 1800 mm Dia. water line diversion at CSIA Domestic Station
    • 900 mm Storm water drain at CSIA Domestic Station
    • Suspender Erection at Utility Support System at Sahar Road Station
    • Tata Oil filled cable supporting in On Road portion at Vidhan Bhavan Station
    • Excavation progress in Grid 19-24 at Hutatma Chowk Station
    • Cable Tray Arrangement supported on Capping Beam for TATA Submarine Cable diversion at Dharavi Station
    • Hanging Arrangement across the Station for Diversion of TATA Submarine Cables at BKC Station
    • Multiple Water Pipelines of Dia (2.7m,-2.4m,-1.45m,-0.6m) Supported by Suspended Erection at Sahar Road Station
    • SEEPZ
    • Girgaon Station Phase - 05 Trenching for utility diversion
    • Support of xx mm Dia Water Pipe Line Beneath the station Box at Worli Station
    • Support of xx mm Dia Water Pipe Line Beneath the station Box at Worli Station
    • Truss Arrangement to House Multiple Mega Utilities at Sahar Road Station
    • UGC07 SEEPZ Station 900 mm Dia waterline supporting works.
    • Vidyanagari Station
    Utility Shifting
    15/11/2018
    16
    • Commencement of initial drive for the first TBM ( WAINGANGA-1) of Package-07
    • The TBM will bore the tunnel from Pali Ground, Marol to CSIA-T2
    • Commencement of initial drive for the first TBM ( WAINGANGA-1) of Package-07
    Commencement of initial drive for the first TBM ( WAINGANGA...
    08/01/2018
    3
    • TBM lowered at Vidyanagari launching shaft.
    • Cutter head of Godavari-1 TBM lowered at Vidyanagari launching shaft.
    • Cutter head of Godavari-1 TBM lowered at Vidyanagari launching shaft.
    • U.P.S. Madan, MC, MMRDA; Deepak Kapoor, CEO, SRA; Milind Mhaiskar, VP and CEO, MAHAD; Sumant Bhange, CO RR Board MAHADA along with Ashwini Bhide, MD MMRC and other senior officials at Vidyanagari lanching shaft witnessing the lowering of cutter head.
    • U.P.S. Madan, MC, MMRDA; Deepak Kapoor, CEO, SRA; Milind Mhaiskar, VP and CEO, MAHAD; Sumant Bhange, CO RR Board MAHADA along with Ashwini Bhide, MD MMRC and other senior officials at Vidyanagari lanching shaft witnessing the lowering of cutter head.
    • Cutter head of Godavari-1 TBM lowered at Vidyanagari launching shaft.
    Lowering of TBM at Vidyanagari launching shaft
    21/12/2017
    6
  • ‹ previous
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • next ›
MMRC
Shri. Uddhav Thackeray
Shri. Uddhav Thackeray
Hon'ble Chief Minister 
Maharashtra

"I appreciate when projects move ahead with required urgency, to achieve desirable results. The 33.5-km Metro-3 corridor (Colaba-Bandra-SEEPZ) is showing promising speed in this direction. Our aim is to complete the project, highly needed to reduce traffic congestion in Mumbai within the schedule time frame. Metros help reduce carbon footprint as well as pollution. It’s the greenest mass rapid transit system.”

Shri. Devendra Fadanvis
Shri. Venkaiah Naidu
Hon. Minister for Urban Development Department 
Government of India.

"The city of Mumbai requires a ‘metro’ to reclaim its lost glory and I, on behalf of the Centre, promise all help to the State. Implementing infrastructure projects in a city like Mumbai isn’t an easy job. It requires positive attitude. Of course, I’m sure the people of this never-say-stop city will lend their wholehearted support to the 33.5-km long Colaba-Bandra-SEEPZ Metro-3 underground corridor.”

MMRC

Recent News

mmrc
कुलाबा-वांद्रे-सीप्झ या मेट्रो 3 मार्गाचे काम संध्या वेगाने सुरू असून
+19 May 2022
मेट्रो 3 कॉरिडोर का 98.9% मार्ग त्यार
+09 May 2022
मेट्रो ३ टनलिंग का 99 प्रतिशत मार्ग तैयार
+09 May 2022
When will Metro work will end? Good news:73% of it is ready
+09 May 2022
मेट्रो लावणार एक हजार झारे
+13 Apr 2022
मेट्रो ३ के लिए 250 करोड़ मंजूर
+23 Mar 2022
Previous Pause Next
MMRC

About MMRC

  • Tenders
  • Project
  • News
  • Contact Us
  • eTender
MMRC

Helpful Information

  • Project Route
MMRC

Policy

  • MMRC Green Policy
  • Disclaimer
  • Privacy Policy
MMRC

Other Govt Sites

  • Govt of India
  • MoHUA
  • Indian Railways
  • Govt of Maharashtra
  • MMRDA
  • Other Metros
MMRC
  • mmrc
  • mmrc
  • mmrc
MMRC

MMRC © 2019. All rights are reserved.

  • mmrc
  • mmrc
  • mmrc
Top