Tenders Published

Sr. No. Title Type Tender Ref No Date Of Issue Download
31 Part Design, Procurement and Part Supply, Installation, Testing and Commissioning of Ballastless Track on the Mainline from Aarey station (excluded) until BKC station (included) andBallasted Track in the area of at-grade Aarey Station and in the Depot area of Mumbai Metro Line 3 (Colaba – Bandra – SEEPZ) and Procurement and Supply of Turnouts, Scissor Crossovers and Buffer Stops for the entire Mainline for Mumbai Metro Line 3 (Colaba – Bandra – SEEPZ) including Package 10 B Addendum No 4 MM3-CBS-TWK-03 (Package 10C) 13/09/2019 file
32 Supply, Installation, Testing, Integration, Commissioning and Support of Common Asset Management System (CAMS) for Mumbai Metro Line 3 (MML3) Notice PRO/MMRC/56 13/09/2019 file
33 Construction of residential cum commercial high-rise building at Kalbadevi CS No. 662 and 1/662 of Bhuleshwar division for rehabilitation of Metro Line-3 Project Affected Persons of Kalbadevi and Girgaon Notice MMRC/Planning/NIT/K3/19/08/2nd call 12/09/2019 file
34 Part Design, Procurement and Part Supply, Installation, Testing and Commissioning of Ballastless Track on the Mainline from Aarey station (excluded) until BKC station (included) andBallasted Track in the area of at-grade Aarey Station and in the Depot area of Mumbai Metro Line 3 (Colaba – Bandra – SEEPZ) and Procurement and Supply of Turnouts, Scissor Crossovers and Buffer Stops for the entire Mainline for Mumbai Metro Line 3 (Colaba – Bandra – SEEPZ) including Package 10 B Bid Query Response MM3-CBS-TWK-03 (Package 10C) 11/09/2019 file
35 Invitation of Quotations for Mid-Term Evaluation of Implementation of the Rehabilitation Action Plan for Mumbai Metro Line-3 RFP MMRC/PLN/SIA/03 09/09/2019 file
36 Invitation of Quotations for Mid-Term Evaluation of Implementation of the Rehabilitation Action Plan for Mumbai Metro Line-3 Notice MMRC/PLN/SIA/03 09/09/2019 file
37 Supply, Installation, Testing and Commissioning (SITC) of 12 nos. of Lifts/Elevator (6nos. of 612Kg / 9Person, and 6nos. of 408Kg/6 Person) including 2 years AMC work at Rehabilitation site of Mumbai Metro Rail Corporation Limited at Building No. 10 A to F Wing (2 lifts in each wing) situated in HDIL Premier Compound, Kurla, Mumbai, Pin code: - 400070. Corrigendum - 1 MMRC/Planning/NIT/ LiftsKurla /19/10 06/09/2019 file
38 Invitation of Tender for Hiring of Office Premises in the vicinity of MMRCL Transit Office Building, North Side of City Park, E Block, Bandra Kurla Complex, Bandra (E), Maharashtra - 400051. Notice MMRC/Planning/NIT//office space/19/10 05/09/2019 file
39 Design, Manufacture, Supply, Installation, Testing & Commissioning of A) Synchronized Under Floor Lifting System, B) Synchronized Mobile Lifting Jacks and C) Bogie Turn Tables Invitation for Bids MM3-CBS-DEQ-9-05 05/09/2019 file
40 Design, Manufacture, Supply, Installation, Testing & Commissioning of A) Synchronized Under Floor Lifting System, B) Synchronized Mobile Lifting Jacks and C) Bogie Turn Tables RFP MM3-CBS-DEQ-9-05 05/09/2019 file

Stay Informed

8 + 7 =
Top