Tenders Published

Sr. No. Title Type Tender Ref No Date Of Issue Download
81 Construction of residential cum commercial high-rise building at Kalbadevi CS No. 662 and 1/662 of Bhuleshwar division for rehabilitation of Metro Line-3 Project Affected Persons of Kalbadevi and Girgaon. Addendum No 1 MMRC/Planning/NIT/K3/19/08/ 2nd Call 24/09/2019
82 Supply of 2250 MT Rails (UIC 60E1, IRS-T-12:2009, 880 grade) for Track work of Mumbai Metro line 3 (Colaba-Bandra-SEEPZ) Rail Project Response to Bidders Queries and Addendum No 1 MM3-CBS-TWK-05 (Package 10E) 20/09/2019 file
83 Design, Manufacture, Supply, Installation, Testing & Commissioning of A) Synchronized Under Floor Lifting System, B) Synchronized Mobile Lifting Jacks and C) Bogie Turn Tables Notice MM3-CBS-DEQ-9-05 20/09/2019 file
84 Supply, Installation, Testing, Integration, Commissioning and Support of Common Asset Management System (CAMS) for Mumbai Metro Line 3 (MML3) Corrigendum - 1 PRO/MMRC/56 19/09/2019 file
85 Invitation for Bids "Supply of 8490 MT Head Hardened (HH) Rails (UIC 60E1, IRS-T-12:2009, 1080 grade) for Track Work of Mumbai Metro Line 3 (Colaba-Bandra-SEEPZ) Rail Project. Response to Bidders Queries and Addendum No 1 MM3-CBS-TWK-04 (Package - 10D) 18/09/2019 file
86 Part Design, Procurement and Part Supply, Installation, Testing and Commissioning of Ballastless Track on the Mainline from Aarey station (excluded) until BKC station (included) andBallasted Track in the area of at-grade Aarey Station and in the Depot area of Mumbai Metro Line 3 (Colaba – Bandra – SEEPZ) and Procurement and Supply of Turnouts, Scissor Crossovers and Buffer Stops for the entire Mainline for Mumbai Metro Line 3 (Colaba – Bandra – SEEPZ) including Package 10 B Addendum No 4 MM3-CBS-TWK-03 (Package 10C) 13/09/2019 file
87 Supply, Installation, Testing, Integration, Commissioning and Support of Common Asset Management System (CAMS) for Mumbai Metro Line 3 (MML3) Notice PRO/MMRC/56 13/09/2019 file
88 Construction of residential cum commercial high-rise building at Kalbadevi CS No. 662 and 1/662 of Bhuleshwar division for rehabilitation of Metro Line-3 Project Affected Persons of Kalbadevi and Girgaon Notice MMRC/Planning/NIT/K3/19/08/2nd call 12/09/2019 file
89 Part Design, Procurement and Part Supply, Installation, Testing and Commissioning of Ballastless Track on the Mainline from Aarey station (excluded) until BKC station (included) andBallasted Track in the area of at-grade Aarey Station and in the Depot area of Mumbai Metro Line 3 (Colaba – Bandra – SEEPZ) and Procurement and Supply of Turnouts, Scissor Crossovers and Buffer Stops for the entire Mainline for Mumbai Metro Line 3 (Colaba – Bandra – SEEPZ) including Package 10 B Bid Query Response MM3-CBS-TWK-03 (Package 10C) 11/09/2019 file
90 Invitation of Quotations for Mid-Term Evaluation of Implementation of the Rehabilitation Action Plan for Mumbai Metro Line-3 Notice MMRC/PLN/SIA/03 09/09/2019 file

Stay Informed

2 + 4 =
Top